Select Date
Generation Outage Details
Report for Date 24-11-2017 Date of Reporting 25-11-2017
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1JPL Stg-IIChhattisgarhJindal power4600Less schedule at present; out on 24/06/17 on loss of all fuel due to heavy jerk24-06-201716:13-
2GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685NO SCHEDULE;GMR intimated no PPA on 10-09-201722-07-201702:00-
3SIPAT IChhattisgarhNTPC3660AOH25-10-201708:32-
4GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685No schedule.15-10-201714:15-
5JPL Stg-IChhattisgarhJindal power1250coal shortage since 12-09-201725-06-201700:05-
6Korba STPSChhattisgarhNTPC5500AOH22-11-201700:05-
7SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
8SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
9SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
10SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
11SSP RBPH(Hy)GujaratSSP5200Low reservoir level01-07-201700:30-
12SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
13CGPLGujaratCGPL_UMPP10830COH07-11-201713:2323-12-2017
14GandharGujaratNTPCGT ST 2219under B-inspection20-11-201706:00-
15DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
16DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
17DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
18RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
19TAPSMaharashtraNPCIL1160Refuelling04-06-201719:0930-11-2017
20RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
21RGPPLMaharashtraRGPPL2A332Unit Change over;Gas shortage17-10-201717:29-
 Sub Total(CS)  7961 
  State Sector (SS)
1KORBA(W) CSPGCL ChhattisgarhCSPGCL1210AOH18-11-201723:50-
2GSEGGujaratGSECL278RSD28-10-201700:00-
3AECOGujaratTorrent PowerC60RSD01-06-201519:50-
4UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
5STPSGujaratGSECL1120RSD26-09-201618:00-
6WanakboriGujaratGSECL3210AOH25-07-201700:0001-11-2017
7Hazira ExtGujaratGSECL1351RSD11-11-201721:16-
8GPECGujaratGSECL1218RSD23-11-201719:23-
9DGBPGujaratGSECL3375RSD27-10-201706:00-
10GSEGGujaratGSECL178RSD28-10-201700:00-
11ALTPSGujaratGSECL2125AOH30-10-201700:26-
12SUGENGujaratTorrent Power3382MAJOR O/H WORK18-11-201723:28-
13DGBPGujaratGSECL1107RSD 15-11-201710:44-
14GPPCGujaratGSECL1351RSD COSTLY GAS15-11-201709:00-
15AECOGujaratTorrent PowerF120AOH07-11-201722:17-
16GPPCGujaratGSECL2351RSD25-10-201723:47-
17GPECGujaratGSECL2218RSD24-11-201720:45-
18GPECGujaratGSECL3218RSD21-11-201714:58-
19PARLIMaharashtraMAHAGENCO5210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201606-07-201514:55-
20PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
21WPCLMaharashtraMAHAGENCO2135change over against unit-3 as per scheduled dispatch29-02-201621:46-
22PIONEER(262+127)MaharashtraMAHAGENCO1388low schedule 07-02-201717:45-
23PARLIMaharashtraMAHAGENCO7250Coal Shortage20-11-201721:00-
24KoradiMaharashtraMAHAGENCO6210Renovation & Modification Work/converted into RSD 20-03-201501:0201-12-2017
25ChandrapurMaharashtraMAHAGENCO5500AOH01-11-201709:2022-11-2017
26TrombayMaharashtraMAHAGENCO8250TRIPPED WHILE WITHDRAWING UNIT. UNIT WAS WITHDRAWING DUE TO TURBINE INSPECTION WHICH WAS PLANNED OUTAGE UP TO 13.12.201718-11-201719:40-
27TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
28WPCLMaharashtraMAHAGENCO1135Low Schedule16-02-201617:03-
 Sub Total(SS) 6742 
Total Planned Outage (CS+SS): 14703

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1SCPLChhattisgarhACBIL150DCS malfunctioning.16-11-201714:37-
2Essar(Mahan)ChhattisgarhESSAR1600btl23-11-201700:08-
3KSKChhattisgarhKSK Mahanadi Power Co Ltd1600Coal Shortage21-11-201713:39-
4JPL Stg-IChhattisgarhJindal power3250COAL SHORTAGE17-11-201721:44-
5VandanaChhattisgarhVandana1135BTL09-01-201515:00-
6SIPAT IChhattisgarhNTPC2660BTL24-11-201720:42-
7JPL Stg-IChhattisgarhJindal power4250Due to Coal Shortage.24-09-201700:00-
8KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated22-05-201722:12-
9DB PowerChhattisgarhDB Power2600Due to high Hydrogen pressure drop rate in generator03-11-201714:03-
10BALCO(300 MW)ChhattisgarhBALCO2300ID fan problem07-11-201700:16-
11DSPMChhattisgarhCSPGCL1250BTL23-11-201719:50-
12RKM PowerChhattisgarhRKMPPL2360due to turbine tripped21-11-201719:50-
13SSP CBPH(Hy)GujaratSSP350Unit-3 220KV CB LBB operated at SSP CBPH20-11-201717:14-
14KawasGujaratNTPCGT 1A106RSD21-11-201719:59-
15KAPSGujaratNPCIL2220NUCLEAR REACTOR SIDE PROB01-07-201514:0901-12-2018
16KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-10-2018
17MOUDAMaharashtraNTPC4660Separator safety valve leakage09-11-201721:45-
18MOUDAMaharashtraNTPC3660BTL22-11-201723:52-
19IEPLMaharashtraIEPL1270Tripped due to turbine vibration high21-11-201723:15-
20Solapur STPSMaharashtraNTPC1660Coal Shortage19-11-201713:10-
21GHATGHARMaharashtraMAHAGENCO2125RBDV LEAKAGE 28-06-201700:01-
 Sub Total(CS) 7626 
  State Sector (SS)
1KORBA EAST EXT(DSPM)ChhattisgarhCSPGCL2250ETL24-11-201719:50-
2KORBA(E)ChhattisgarhCSPGCL250Mill fan problem23-10-201720:53-
3KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
4UkaiGujaratGSECL2120Long restoration period 09-04-201616:00-
5STPSGujaratGSECL2120BUNKER PROBLEM24-09-201613:05-
6UkaiGujaratGSECL1120EXCITATION PROBLEM07-05-201603:18-
7BECLGujaratGSECL1250Lignite fuel problem17-11-201701:09-
8KLTPSGujaratGSECL475BELLOW LEAKAGES27-10-201723:55-
9SLPPGujaratGSECL2125PA FAN PROBLEM16-11-201717:07-
10APL MundraGujaratAdani Transmission India Limited5660APH Á'GUIDE VAN TEMPERATURE HIGH01-11-201723:43-
11EPGLGujaratESSAR1600Coal shortage31-10-201723:54-
12BECLGujaratGSECL2250DRUM LEVEL HIGH22-08-201716:3420-10-2017
13KLTPSGujaratGSECL375BOTTOM ASH CHAIN PROBLEM22-11-201709:57-
14GandhinagarGujaratGSECL1120Long restoration period 09-04-201601:30-
15GandhinagarGujaratGSECL2120Long restoration period 09-04-201601:30-
16UTRAN STG IIGujaratGSECL1375RSD23-11-201719:28-
17APL MundraGujaratAdani Transmission India Limited6660Turbine bearing temperature high.20-10-201720:20-
18EPGLGujaratESSAR2600coal shortage 24-10-201720:25-
19Satpura IIMadhya PradeshMPPGCL6200COAL SHORTAGE14-10-201714:15-
20Satpura IIIMadhya PradeshMPPGCL9210SPARKING ON GT WHILE SYNCHRONIZING FROM AOHDEVELOPED INTO FIRE24-08-201721:05-
21SingajiMadhya PradeshMPPGCL2600STATION TRANSFORMER TRIP23-11-201713:25-
22AmarkantakMadhya PradeshMPPGCL3120Fire Caught in Turbine Floor12-01-201500:25-
23AmarkantakMadhya PradeshMPPGCL4120Turbine Vibration High30-04-201411:13-
24Satpura IIMadhya PradeshMPPGCL7210Economizer tube leakage/Coal shortage14-09-201702:20-
25RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270COAL SHORTAGE10-11-201700:00-
26RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270COAL SHORTAGE17-09-201702:01-
27Dhariwal STUMaharashtraDhariwal Infrastructure Ltd1300Drum level high27-10-201717:31-
28ChandrapurMaharashtraMAHAGENCO3210Boiler tube leakage. Continued due to shortage of water from dt.01/11/17 0:00 hrs25-10-201700:45-
29PARLIMaharashtraMAHAGENCO8250BTL24-11-201712:50-
30KoradiMaharashtraMAHAGENCO7210Poor coal receipt01-11-201700:05-
31BhusawalMaharashtraMAHAGENCO3210coal shortage31-10-201722:37-
32RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270COAL SHORTAGE17-09-201700:03-
33KhaparkhedaMaharashtraMAHAGENCO3210Poor Coal Receipt 12-09-201700:00-
34APML TirodaMaharashtraAdani Transmission India Limited3660HP heater bellow problem17-11-201720:59-
35KhaparkhedaMaharashtraMAHAGENCO1210COAL SHORTAGE18-11-201719:23-
36KhaparkhedaMaharashtraMAHAGENCO2210tripped on protection alarm20-11-201712:14-
37UranMaharashtraMAHAGENCO8108Bearing pressure very high14-08-201607:57-
38KoradiMaharashtraMAHAGENCO5200ID Fan problem, Converted to Zero Schedule By MSEDCL from 00.00hrs/22- 9-16. Shutdown taken on 18.10.2016 at 00:00Hrs for Turbine inspection and maintenance work05-09-201600:21-
39BhusawalMaharashtraMAHAGENCO2210BTL14-06-201619:35-
40KORADI-2(MSEDCL)MaharashtraMAHAGENCO8660coal shortage07-11-201700:06-
41JaigadMaharashtraMAHAGENCO3300electrical fault22-11-201708:58-
42ChandrapurMaharashtraMAHAGENCO4210Auxiliary supply failure. Continued due to water shortage from dt. 01/11/17 0:00 hrs.29-10-201704:45-
43APML TirodaMaharashtraAdani Transmission India Limited5660LEAKAGE IN SEAL AIR DUCT.19-11-201720:40-
44NasikMaharashtraMAHAGENCO5210FLAME FAILURE16-11-201704:45-
 Sub Total(SS)11918 
Total Forced Outage (CS+SS): 19544

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
79617626155876742119181866034247

Generating Units Revived during last day which were out before 24-11-17
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1RGPPLMaharashtraRGPPL2B332Unit Change over;Gas shortage17-10-201703:5024-11-201715:20
 Sub Total(CS) 332 
  State Sector (SS)
1SingajiMadhya PradeshMadhya Pradesh1600cOAL sHORTAGE.20-11-201723:5524-11-201717:57
2GIPCL STGGujaratGujarat2165RSD21-11-201719:5524-11-201711:02
3KORBA(E)ChhattisgarhChattisgarh350BTL22-11-201707:3024-11-201721:53
4WPCLMaharashtraMaharashtra3135No schedule23-11-201700:0124-11-201711:19
5WanakboriGujaratGujarat5210btl23-11-201710:2224-11-201714:23
6GPECGujaratGujarat2218RSD23-11-201719:4524-11-201717:02
7KhaparkhedaMaharashtraMaharashtra4210Electrical fault23-11-201719:5624-11-201700:16
 Sub Total(SS) 1588 
Total (CS+SS): 1920

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
2DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
3DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
4JPL Stg-IIChhattisgarhJindal power4600Less schedule at present; out on 24/06/17 on loss of all fuel due to heavy jerk24-06-201716:13-
5GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685NO SCHEDULE;GMR intimated no PPA on 10-09-201722-07-201702:00-
6GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685No schedule.15-10-201714:15-
7KawasGujaratNTPCGT 1A106RSD21-11-201719:59-
 Sub Total(CS) 3276 
  State Sector (SS)
1KoradiMaharashtraMaharashtra6210Renovation & Modification Work/converted into RSD 20-03-201501:0201-12-2017
2AECOGujaratTorrent PowerC60RSD01-06-201519:50-
3WPCLMaharashtraMaharashtra1135Low Schedule16-02-201617:03-
4UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
5STPSGujaratGujarat1120RSD26-09-201618:00-
6PIONEER(262+127)MaharashtraMaharashtra1388low schedule 07-02-201717:45-
7GPPCGujaratGujarat2351RSD25-10-201723:47-
8DGBPGujaratGujarat3375RSD27-10-201706:00-
9GSEGGujaratGujarat278RSD28-10-201700:00-
10GSEGGujaratGujarat178RSD28-10-201700:00-
11Hazira ExtGujaratGujarat1351RSD11-11-201721:16-
12GPPCGujaratGujarat1351RSD COSTLY GAS15-11-201709:00-
13DGBPGujaratGujarat1107RSD 15-11-201710:44-
14GPECGujaratGujarat3218RSD21-11-201714:58-
15GPECGujaratGujarat1218RSD23-11-201719:23-
16UTRAN STG IIGujaratGujarat1375RSD23-11-201719:28-
17GPECGujaratGujarat2218RSD24-11-201720:45-
 Sub Total(S S) 4015 
Total Low Demand Outage (CS+SS): 7291