Report for Date 16-11-2018 Date of Reporting 17-11-2018
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1Essar(Mahan)ChhattisgarhESSAR2600Low schedule08-11-201800:02-
2Korba STPSChhattisgarhNTPC3200AOH21-10-201800:18-
3DGENGujaratTorrent Power51400NO SCHEDULE(NO PPA)22-05-201800:00-
4DGENGujaratTorrent Power53400NO SCHEDULE(NO PPA)23-12-201619:12-
5DGENGujaratTorrent Power52400NO SCHEDULE(NO PPA)25-11-201620:00-
6SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
7SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
8KawasGujaratNTPCGT 2B106RSD15-11-201822:30-
9KawasGujaratNTPCST 2C116.10RSD15-11-201822:24-
10Gandhar GT 3GujaratNTPC3144.30RSD15-11-201817:59-
11KawasGujaratNTPCGT 2A106RSD;available only in open cycle since 15:00hrs/13-11-201813-11-201800:34-
12Gandhar GT 1GujaratNTPC1144.30RSD12-11-201822:57-
13SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
14SSP RBPH(Hy)GujaratSSP5200Low reservoir level; unit-5 is on AOH since 09:00hrs/01.12.201701-07-201700:30-
15SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
16SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
17RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
18Solapur STPSMaharashtraNTPC1660RSD14-11-201800:23-
19RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
20RGPPLMaharashtraRGPPL2A332unit change over;less gas availability04-11-201817:53-
21RGPPLMaharashtraRGPPL2B332unit change over;less gas availability05-11-201801:20-
 Sub Total(CS)  5780.70 
  State Sector (SS)
1DGBPGujaratGSECL3375RSD05-11-201814:22-
2BECLGujaratGSECL2250BOILER INSPECTION20-10-201822:49-
3UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
4UTRAN STG IIGujaratGSECL1375RSD.03-11-201800:17-
5SUGENGujaratTorrent Power2382RSD04-11-201801:49-
6GandhinagarGujaratGSECL4210RSD.06-11-201812:07-
7SUGENGujaratTorrent Power3382RSD Low schedule07-11-201800:06-
8WanakboriGujaratGSECL2210RSD14-11-201822:04-
9WanakboriGujaratGSECL4210RSD14-11-201823:05-
10GIPCL STGGujaratGSECL232rsd22-10-201823:55-
11GSEGGujaratGSECL178RSD11-10-201822:26-
12GPPCGujaratGSECL2351RSD17-10-201820:47-
13DGBPGujaratGSECL2112RSD.14-11-201808:20-
14GPECGujaratGSECL3218RSD12-11-201823:23-
15GPECGujaratGSECL2218RSD16-11-201819:33-
16GPECGujaratGSECL1218RSD04-11-201800:55-
17GSEG STAGE IIGujaratGSECL1351RSD31-10-201823:25-
18STPSGujaratGSECL4250RSD06-11-201800:02-
19GPPCGujaratGSECL1351RSD.02-11-201820:40-
20AECOGujaratTorrent PowerF120AOH07-11-201800:00-
21GIPCL STGGujaratGSECL2165No purchase from 1st March 1801-03-201800:00-
22WanakboriGujaratGSECL6210RSD15-11-201823:45-
23PIONEER(262+127)MaharashtraMAHAGENCO1388RSD07-02-201717:45-
24PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
25ParasMaharashtraMAHAGENCO4250BTL16-11-201800:00-
26URAN B0MaharashtraMAHAGENCO1120Transformer shifting work08-09-201812:19-
27WPCLMaharashtraMAHAGENCO3135AOH01-11-201800:28-
28WPCLMaharashtraMAHAGENCO2135No PPA16-11-201800:00-
29WPCLMaharashtraMAHAGENCO1135RSD/No PPA16-02-201617:03-
30TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
 Sub Total(SS) 7323 
Total Planned Outage (CS+SS): 13103.70

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1KSKChhattisgarhKSK Mahanadi Power Co Ltd3600APH problem./Coal shortage since 00:00hrs/15-10-201803-10-201802:29-
2VandanaChhattisgarhVandana1135BTL09-01-201515:00-
3JPL Stg-IChhattisgarhJindal power1250Coal shortage24-10-201800:00-
4KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated/maintenance22-05-201722:12-
5BALCO(300 MW)ChhattisgarhBALCO1300problem in ID Fan.01-11-201820:18-
6SKS PowerChhattisgarhSKS1300Turbine vibration high23-09-201800:06-
7JPL Stg-IChhattisgarhJindal power2250Condenser tube leakage/Coal shortage since 00:00hrs of 02-09-201830-08-201821:15-
8JPL Stg-IIChhattisgarhJindal power1600hydrogen leakage in generator12-08-201822:30-
9GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685Turbine casing drain heavy leakage17-04-201823:39-
10JPL Stg-IIChhattisgarhJindal power3600Coal shortage26-10-201819:55-
11RKM PowerChhattisgarhRKMPPL2360Coal shortage17-10-201818:33-
12SKS PowerChhattisgarhSKS2300Coal Shortage01-10-201800:03-
13GandharGujaratNTPC4224.29Rotor E/F31-08-201822:11-
14CGPLGujaratCGPL_UMPP20830BTL13-11-201819:54-
15KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-05-2019
16GadarwadaMadhya PradeshNTPC1800separator pressure high02-11-201805:03-
17VSTPSMadhya PradeshNTPC1210BTL15-11-201803:37-
 Sub Total(CS) 7264.29 
  State Sector (SS)
1Marwa TPSChhattisgarhCSPGCL2500BTL15-11-201822:47-
2KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
3KORBA(E)ChhattisgarhCSPGCL250Mill fan problem23-10-201720:53-
4KORBA(E)ChhattisgarhCSPGCL450Due to outage of mill14-09-201815:46-
5KORBA(E)ChhattisgarhCSPGCL350Super heater problem12-09-201812:42-
6KLTPSGujaratGSECL270Furnace Pressure high/subsequently kept out on BTL09-11-201810:56-
7DGBPGujaratGSECL1107TRIPPED DUE TO TRIPPING OF EVACUATION LINES/LATER TURBINE GEAR PROBLEM DEVELOPED25-09-201812:54-
8EPGLGujaratESSAR1600Coal shortage23-01-201818:51-
9APL MundraGujaratAdani Transmission India Limited6660Hydrogen leakage and COAL SHORTAGE ALSO REPORTED from 01.11.1826-09-201823:50-
10EPGLGujaratESSAR2600coal shortage 24-10-201720:25-
11APL MundraGujaratAdani Transmission India Limited5660Due to steam leakage from Turbine HPCV 2 and COAL SHORTAGE ALSO REPORTED from 01.11.201803-10-201802:08-
12APL MundraGujaratAdani Transmission India Limited9660CTL.02-11-201801:00-
13Satpura IIIMadhya PradeshMPPGCL9210Air preheater problem01-11-201812:35-
14Satpura IIIMadhya PradeshMPPGCL8210Electrical fault15-11-201811:47-
15UranMaharashtraMAHAGENCO8108heat rate high08-09-201822:08-
16KhaparkhedaMaharashtraMAHAGENCO3210BTL16-11-201818:04-
17IEPLMaharashtraIEPL1270Coal Shortage28-08-201821:26-
18RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270Tripped due to furnace pressure high;poor coal receipt w.e.f 00:00hrs/25-09-201822-09-201822:54-
19PARLIMaharashtraMAHAGENCO7250Poor coal receipt19-10-201800:23-
20ChandrapurMaharashtraMAHAGENCO8500BTL16-11-201822:40-
21KhaparkhedaMaharashtraMAHAGENCO1210Coal Shortage11-08-201823:57-
22VIPLMaharashtraMAHAGENCO1300Coal shortage.17-10-201800:30-
23RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270COAL SHORTAGE21-09-201800:00-
24ChandrapurMaharashtraMAHAGENCO4210Sparking at slippering carbon brush;poor coal receipt w.e.f 18:45hrs/04-11-201831-10-201807:54-
25GHATGHARMaharashtraMAHAGENCO2125STATOR EARTH FAULT29-06-201801:12-
26RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd4270Coal Shortage20-09-201800:01-
27ParasMaharashtraMAHAGENCO3250GT PROTECTION OPERATED.15-09-201800:55-
28KoradiMaharashtraMAHAGENCO7210Coal Shortage03-08-201815:54-
29BhusawalMaharashtraMAHAGENCO3210COAL SHORTAGE07-06-201800:02-
30UranMaharashtraMAHAGENCO7108Compressor search protection20-07-201812:53-
 Sub Total(SS)8248 
Total Forced Outage (CS+SS): 15512.29

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
5780.707264.2913044.99732382481557128615.99

Generating Units Revived during last day which were out before 16-11-18
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1JPL Stg-IIChhattisgarhJindal power4600Coal Shortage.07-11-201823:5516-11-201821:07
 Sub Total(CS) 600 
  State Sector (SS)
1NasikMaharashtraMaharashtra5210Boiler license validity extension;later reason changed to Coal swapping with DIL26-10-201812:1516-11-201814:04
2KoradiMaharashtraMaharashtra6210Auxiliary Transformer Tripped 11-11-201819:5816-11-201815:29
3SLPPGujaratGujarat2125BTL12-11-201808:5416-11-201816:36
4GPECGujaratGujarat2218RSD.14-11-201808:1116-11-201810:45
 Sub Total(SS) 763 
Total (CS+SS): 1363

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1DGENGujaratTorrent Power52400NO SCHEDULE(NO PPA)25-11-201620:00-
2DGENGujaratTorrent Power53400NO SCHEDULE(NO PPA)23-12-201619:12-
3DGENGujaratTorrent Power51400NO SCHEDULE(NO PPA)22-05-201800:00-
4Essar(Mahan)ChhattisgarhESSAR2600Low schedule08-11-201800:02-
5Gandhar GT 1GujaratNTPC1144.30RSD12-11-201822:57-
6KawasGujaratNTPCGT 2A106RSD;available only in open cycle since 15:00hrs/13-11-201813-11-201800:34-
7Solapur STPSMaharashtraNTPC1660RSD14-11-201800:23-
8Gandhar GT 3GujaratNTPC3144.30RSD15-11-201817:59-
9KawasGujaratNTPCST 2C116.10RSD15-11-201822:24-
10KawasGujaratNTPCGT 2B106RSD15-11-201822:30-
 Sub Total(CS) 3076.70 
  State Sector (SS)
1WPCLMaharashtraMaharashtra1135RSD/No PPA16-02-201617:03-
2UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
3PIONEER(262+127)MaharashtraMaharashtra1388RSD07-02-201717:45-
4GSEGGujaratGujarat178RSD11-10-201822:26-
5GPPCGujaratGujarat2351RSD17-10-201820:47-
6GIPCL STGGujaratGujarat232rsd22-10-201823:55-
7GSEG STAGE IIGujaratGujarat1351RSD31-10-201823:25-
8GPPCGujaratGujarat1351RSD.02-11-201820:40-
9UTRAN STG IIGujaratGujarat1375RSD.03-11-201800:17-
10GPECGujaratGujarat1218RSD04-11-201800:55-
11SUGENGujaratTorrent Power2382RSD04-11-201801:49-
12DGBPGujaratGujarat3375RSD05-11-201814:22-
13STPSGujaratGujarat4250RSD06-11-201800:02-
14GandhinagarGujaratGujarat4210RSD.06-11-201812:07-
15SUGENGujaratTorrent Power3382RSD Low schedule07-11-201800:06-
16GPECGujaratGujarat3218RSD12-11-201823:23-
17DGBPGujaratGujarat2112RSD.14-11-201808:20-
18WanakboriGujaratGujarat2210RSD14-11-201822:04-
19WanakboriGujaratGujarat4210RSD14-11-201823:05-
20WanakboriGujaratGujarat6210RSD15-11-201823:45-
21GPECGujaratGujarat2218RSD16-11-201819:33-
 Sub Total(S S) 5438 
Total Low Demand Outage (CS+SS): 8514.70