Select Date
Generation Outage Details
Report for Date 26-05-2017 Date of Reporting 27-05-2017
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1TRN EnergyChhattisgarhACBIL1300Technical problem in Ash evacuation system of the plant19-05-201701:45-
2MCCPLChhattisgarhACBIL1300AOH06-05-201723:59-
3RKM PowerChhattisgarhRKMPPL2360No Schedule23-03-201700:36-
4Korba STPSChhattisgarhNTPC3200Testing works on completion of R & M ,outage for 3 days25-05-201702:00-
5JPL Stg-IIChhattisgarhJindal power3600Less Schedule17-06-201609:54-
6GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685No Schedule02-08-201601:10-
7JPL Stg-IIChhattisgarhJindal power4600Taken out after COD test11-12-201613:59-
8GandharGujaratNTPCGT ST 1219RSD/Less schedule23-05-201701:11-
9CGPLGujaratCGPL_UMPP30830HP Heater & Bottom ash hopper Problem18-05-201701:34-
10KawasGujaratNTPCST 1C116.10RSD/ less schedule13-05-201707:30-
11KawasGujaratNTPCGT 1B106RSD16-05-201713:17-
12DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
13DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
14DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
15KawasGujaratNTPCGT 1A106RSD/Less schedule15-05-201700:00-
16Jhabua PowerMadhya PradeshJhabua Power1600BOILER LICENCE RENEWAL; THE UNIT IS IN THE PROCESS OF WITHDRAWAL AT 24:00HRS BUT TRIPPED AT 23:36HRS ON FLAME FAILURE19-05-201723:36-
17TAPSMaharashtraNPCIL4540Bi annual maintenance and routine surveillance test23-04-201719:55-
18RGPPLMaharashtraRGPPL2B332UNIT CHANGE OVER10-04-201717:17-
19RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation08-07-201413:30-
20RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation31-03-201423:00-
21RGPPLMaharashtraRGPPL2A332unit change over18-05-201718:05-
 Sub Total(CS)  8066.10 
  State Sector (SS)
1GPPCGujaratGSECL2351RSD29-04-201714:05-
2UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
3GPECGujaratGSECL2218RSD26-05-201708:32-
4GPPCGujaratGSECL1351RSD COSTLY GENERATION23-05-201703:44-
5ESSAR IPPGujaratESSARGT 3172No Schedule04-03-201320:47-
6DGBPGujaratGSECL3375 Taken in RSD13-05-201723:34-
7AECOGujaratTorrent PowerC60RSD01-06-201519:50-
8STPSGujaratGSECL1120RSD26-09-201618:00-
9GSEGGujaratGSECL178RSD16-12-201616:41-
10Hazira ExtGujaratGSECL1351RSD04-05-201723:28-
11GPECGujaratGSECL3218RSD26-05-201707:46-
12APL MundraGujaratAdani Transmission India Limited6660Critical Coal Stock Position27-04-201702:58-
13KLTPSGujaratGSECL475 To attend various works 08-05-201700:00-
14GIPCL STGGujaratGSECL2165RSD10-03-201714:08-
15DGBPGujaratGSECL1107RSD08-04-201702:10-
16GSEGGujaratGSECL278RSD26-03-201716:27-
17Satpura IIMadhya PradeshMPPGCL7210RSD10-03-201715:00-
18SingajiMadhya PradeshMPPGCL1600RSD/ Merit order despatch20-05-201719:00-
19Satpura IIIMadhya PradeshMPPGCL8210RSD08-05-201718:17-
20Satpura IIIMadhya PradeshMPPGCL9210RSD07-05-201720:34-
21KoradiMaharashtraMAHAGENCO6210Renovation & Modification Work 20-03-201501:02-
22TrombayMaharashtraMAHAGENCO6500AOH06-03-201600:00-
23WPCLMaharashtraMAHAGENCO2135change over against unit-3 as per scheduled dispatch29-02-201621:46-
24WPCLMaharashtraMAHAGENCO1135Low Schedule16-02-201617:03-
25PIONEER(262+127)MaharashtraMAHAGENCO1388low schedule 07-02-201717:45-
26ChandrapurMaharashtraMAHAGENCO7500turbine bearing vibration high23-05-201704:31-
 Sub Total(SS) 6859 
Total Planned Outage (CS+SS): 14925.10

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685due to turbine bearing no-5 vibration high22-04-201722:09-
2JPL Stg-IIChhattisgarhJindal power1600ASH EVACUATION PROBLEM.30-04-201713:30-
3DB PowerChhattisgarhDB Power2600Generator Transformer Problem24-05-201723:06-
4TRN EnergyChhattisgarhACBIL2300Technical problem in Ash evacuation system of the plant20-05-201715:24-
5KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated22-05-201722:12-
6SIPAT IChhattisgarhNTPC1660Tripped during Over speed test./AOH from 22:00hrs27-04-201721:01-
7KSKChhattisgarhKSK Mahanadi Power Co Ltd2600BTL22-05-201714:18-
8VandanaChhattisgarhVandana1135BTL09-01-201515:00-
9KSKChhattisgarhKSK Mahanadi Power Co Ltd1600BOTTOM ASH PROBLEM21-05-201700:04-
10CGPLGujaratCGPL_UMPP50830Metal Temp Problem28-04-201702:29-
11KAPSGujaratNPCIL2220NUCLEAR REACTOR SIDE PROB01-07-201514:09-
12KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:52-
13SasanMadhya PradeshSASAN_UMPP3660Turbine valve Problem16-05-201719:36-
14VSTPSMadhya PradeshNTPC8500fire on Y phase GT transformer of VSTPS Unit no 823-05-201717:43-
15MOUDAMaharashtraNTPC3660HEAVY FURNACE DISTURBANCE.06-05-201717:58-
 Sub Total(CS) 7870 
  State Sector (SS)
1KORBA(E)ChhattisgarhCSPGCL150COAL MILL FAN PROBLEM13-04-201713:27-
2KORBA(E)ChhattisgarhCSPGCL450BTL24-05-201723:12-
3UkaiGujaratGSECL2120Long restoration period 09-04-201616:00-
4STPSGujaratGSECL2120BUNKER PROBLEM24-09-201613:05-
5AECOGujaratTorrent PowerD120132 kv side string flash over observed(132 KV Narangpura line)22-05-201718:03-
6AECOGujaratTorrent PowerF120132 kv side string flash over observed(132 KV Narangpura line)22-05-201718:03-
7UkaiGujaratGSECL1120EXCITATION PROBLEM07-05-201603:18-
8BECLGujaratGSECL2250AIR PRE HEATER PROBLEM27-03-201700:00-
9GandhinagarGujaratGSECL1120Long restoration period 09-04-201601:30-
10GPECGujaratGSECL1218Under RSD12-05-201715:40-
11APL MundraGujaratAdani Transmission India Limited4330Capital overhauling25-05-201702:04-
12AECOGujaratTorrent PowerE120132 kv side string flash over observed(132 KV Narangpura line)22-05-201718:03-
13BECLGujaratGSECL1250COMBUSTION PROBLEM26-05-201717:57-
14APL MundraGujaratAdani Transmission India Limited5660DETERIORATION IN COAL STOCK POSITION03-05-201702:46-
15GandhinagarGujaratGSECL2120Long restoration period 09-04-201601:30-
16Sanjay Gandhi TPSMadhya PradeshMPPGCL1210Ash handling plant problem13-05-201714:30-
17AmarkantakMadhya PradeshMPPGCL4120Turbine Vibration High30-04-201411:13-
18AmarkantakMadhya PradeshMPPGCL3120Fire Caught in Turbine Floor12-01-201500:25-
19Satpura IIMadhya PradeshMPPGCL6200Deaerator Problem21-02-201711:50-
20RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270flame failure24-05-201703:27-
21APML TirodaMaharashtraAdani Transmission India Limited4660 COAL SHORTAGE. 21-05-201722:35-
22KhaparkhedaMaharashtraMAHAGENCO5500BTL26-05-201719:42-
23UranMaharashtraMAHAGENCO8108Bearing pressure very high14-08-201607:57-
24KoradiMaharashtraMAHAGENCO5200ID fan problem05-09-201600:21-
25ChandrapurMaharashtraMAHAGENCO1210BTL28-08-201407:15-
26BhusawalMaharashtraMAHAGENCO2210BTL14-06-201619:35-
27KORADI-2(MSEDCL)MaharashtraMAHAGENCO10660Bunkering Problem22-05-201715:30-
28PARLIMaharashtraMAHAGENCO8250Condensor vaccum low24-05-201722:54-
29BhusawalMaharashtraMAHAGENCO4500BTL25-05-201719:25-
30ChandrapurMaharashtraMAHAGENCO2210BTL12-01-201604:42-
31PARLIMaharashtraMAHAGENCO4210Water Shortage05-07-201518:45-
32PARLIMaharashtraMAHAGENCO5210Water Shortage06-07-201514:55-
33RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270Coal shortage15-04-201708:59-
34KhaparkhedaMaharashtraMAHAGENCO3210Air Heater Problem25-05-201714:03-
35WPCLMaharashtraMAHAGENCO3135ID fan problem15-05-201702:43-
 Sub Total(SS)8231 
Total Forced Outage (CS+SS): 16101

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
8066.10787015936.10685982311509031026.10

Generating Units Revived during last day which were out before 26-05-17
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1CGPLGujaratCGPL_UMPP10830SPRAY LINE PROBLEM22-05-201711:5726-05-201710:11
2BALCO(300 MW)ChhattisgarhBALCO4300Ash handling problem23-05-201704:5826-05-201704:40
 Sub Total(CS) 1130 
  State Sector (SS)
1UTRAN STG IIGujaratGujarat1375RSD13-05-201708:5826-05-201708:56
2APL MundraGujaratAdani Transmission India Limited8660Pre-Heater leakage18-05-201705:0626-05-201706:32
3GPECGujaratGujarat3218RSD25-05-201701:4426-05-201706:13
4GPECGujaratGujarat2218RSD25-05-201701:4826-05-201706:01
 Sub Total(SS) 1471 
Total (CS+SS): 2601

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1JPL Stg-IIChhattisgarhJindal power3600Less Schedule17-06-201609:54-
2GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685No Schedule02-08-201601:10-
3DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
4DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
5DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
6RKM PowerChhattisgarhRKMPPL2360No Schedule23-03-201700:36-
7KawasGujaratNTPCST 1C116.10RSD/ less schedule13-05-201707:30-
8KawasGujaratNTPCGT 1A106RSD/Less schedule15-05-201700:00-
9KawasGujaratNTPCGT 1B106RSD16-05-201713:17-
10GandharGujaratNTPCGT ST 1219RSD/Less schedule23-05-201701:11-
 Sub Total(CS) 3392.10 
  State Sector (SS)
1ESSAR IPPGujaratESSARGT 3172No Schedule04-03-201320:47-
2AECOGujaratTorrent PowerC60RSD01-06-201519:50-
3WPCLMaharashtraMaharashtra1135Low Schedule16-02-201617:03-
4UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
5STPSGujaratGujarat1120RSD26-09-201618:00-
6GSEGGujaratGujarat178RSD16-12-201616:41-
7PIONEER(262+127)MaharashtraMaharashtra1388low schedule 07-02-201717:45-
8GIPCL STGGujaratGujarat2165RSD10-03-201714:08-
9Satpura IIMadhya PradeshMadhya Pradesh7210RSD10-03-201715:00-
10GSEGGujaratGujarat278RSD26-03-201716:27-
11DGBPGujaratGujarat1107RSD08-04-201702:10-
12GPPCGujaratGujarat2351RSD29-04-201714:05-
13Hazira ExtGujaratGujarat1351RSD04-05-201723:28-
14Satpura IIIMadhya PradeshMadhya Pradesh9210RSD07-05-201720:34-
15Satpura IIIMadhya PradeshMadhya Pradesh8210RSD08-05-201718:17-
16GPECGujaratGujarat1218Under RSD12-05-201715:40-
17DGBPGujaratGujarat3375 Taken in RSD13-05-201723:34-
18SingajiMadhya PradeshMadhya Pradesh1600RSD/ Merit order despatch20-05-201719:00-
19GPPCGujaratGujarat1351RSD COSTLY GENERATION23-05-201703:44-
20GPECGujaratGujarat3218RSD26-05-201707:46-
21GPECGujaratGujarat2218RSD26-05-201708:32-
 Sub Total(S S) 4997 
Total Low Demand Outage (CS+SS): 8389.10