A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1JPL Stg-IIChhattisgarhJindal power4600RSD05-01-201821:18-
2DGENGujaratTorrent Power53400RSD23-12-201619:12-
3DGENGujaratTorrent Power52400RSD25-11-201620:00-
4SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
5GandharGujaratNTPCGT ST 1219RSD27-05-201806:00-
6SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
7SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
8SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
9SSP RBPH(Hy)GujaratSSP5200Low reservoir level; unit-5 is on AOH since 09:00hrs/01.12.201701-07-201700:30-
10SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
11GandharGujaratNTPCGT ST 3219RSD27-05-201806:00-
12KawasGujaratNTPCGT ST 2A164RSD26-05-201800:20-
13BANASAGAR TONSMadhya PradeshMPPGCL1105AOH. Expected date of revival 27/04/201802-04-201810:30-
14RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
15MOUDAMaharashtraNTPC2500AOH21-05-201800:00-
16RGPPLMaharashtraRGPPL3B332unit change over;less gas availability11-05-201817:40-
17RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
18RGPPLMaharashtraRGPPL2A332unit revived earlier for testing purpose taken out on less gas availability18-04-201813:04-
 Sub Total(CS)  5111 
  State Sector (SS)
1DGBPGujaratGSECL3375RSD24-05-201816:00-
2GSEG STAGE IIGujaratGSECL1351RSD25-05-201812:31-
3UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
4UTRAN STG IIGujaratGSECL1375RSD27-05-201809:43-
5GIPCL STGGujaratGSECL2165No purchase from 1st March 1801-03-201800:00-
6BECLGujaratGSECL2250OEM BHEL pending work22-04-201800:00-
7DGBPGujaratGSECL1107RSD21-05-201820:54-
8SLPPGujaratGSECL4125AOH06-05-201812:10-
9GSEGGujaratGSECL178RSD21-05-201815:44-
10GSEGGujaratGSECL278RSD20-05-201806:00-
11Sanjay Gandhi TPSMadhya PradeshMPPGCL5500TURBINE VIBRATIONS/AOH12-05-201800:00-
12TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
13PIONEER(262+127)MaharashtraMAHAGENCO1388RSD07-02-201717:45-
14NasikMaharashtraMAHAGENCO5210BOILER VALIDITY CERTIFICATION25-05-201816:00-
15KoradiMaharashtraMAHAGENCO6210Renovation & Modification Work20-03-201501:02-
16PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
17WPCLMaharashtraMAHAGENCO2135RSD/No PPA29-02-201621:46-
18WPCLMaharashtraMAHAGENCO1135RSD/No PPA16-02-201617:03-
19PARLIMaharashtraMAHAGENCO5210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201606-07-201514:55-
 Sub Total(SS) 4784 
Total Planned Outage (CS+SS): 9895

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1SKS PowerChhattisgarhSKS1300Problem in the Dust evacuation system in Bottom Ash System 17-05-201806:24-
2KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated/maintenance22-05-201722:12-
3JPL Stg-IChhattisgarhJindal power2250COAL SHORTAGE11-02-201800:00-
4JPL Stg-IIChhattisgarhJindal power1600due to Boiler Drum safety valve simmering problem 19-05-201812:36-
5SIPAT IChhattisgarhNTPC1660BTL26-05-201818:20-
6GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685Turbine casing drain heavy leakage17-04-201823:39-
7RKM PowerChhattisgarhRKMPPL2360BOILER TUBE LEAKAGE14-05-201812:15-
8VandanaChhattisgarhVandana1135BTL09-01-201515:00-
9KSKChhattisgarhKSK Mahanadi Power Co Ltd4600unit-2, 3 & 4 were running at KSK. As KSK-Champa-3 line tripped the Unit-4 tripped.; lighted up at 20:00hrs/27.04 but boxed up @01:00hrs/28.04 due to Boiler auxiliary problem27-04-201818:33-
10JPL Stg-IChhattisgarhJindal power4250Flame failure27-05-201821:26-
11CGPLGujaratCGPL_UMPP50830Withdrawn for feed water pre-heater repair15-03-201801:39-
12KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-10-2018
13DGENGujaratTorrent Power51400not able to run in combined cycle21-05-201821:30-
14KAPSGujaratNPCIL2220NUCLEAR REACTOR SIDE PROB01-07-201514:0901-12-2018
15Jhabua PowerMadhya PradeshJhabua Power1600GT earth fault26-05-201815:36-
16SasanMadhya PradeshSASAN_UMPP3660boiler trip (MFT at Partial flame loss).27-05-201822:48-
17GHATGHARMaharashtraMAHAGENCO1125Stator earth fault14-04-201823:45-
 Sub Total(CS) 7495 
  State Sector (SS)
1KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
2KORBA(E)ChhattisgarhCSPGCL250Mill fan problem23-10-201720:53-
3BECLGujaratGSECL1250WATER SHORTAGE23-05-201810:50-
4EPGLGujaratESSAR1600Coal shortage23-01-201818:51-
5APL MundraGujaratAdani Transmission India Limited1330condenser tube leakage; Coal shortage since 21-01-201807-01-201806:46-
6APL MundraGujaratAdani Transmission India Limited2330Coal shortage20-01-201822:30-
7APL MundraGujaratAdani Transmission India Limited9660abnormal sound observed from gear box with current hunting in APH-9;B;thereafter withheld from 08.02.18 for coal shortage.24-01-201809:15-
8APL MundraGujaratAdani Transmission India Limited3330Low bunker level / coal shortage25-05-201805:55-
9APL MundraGujaratAdani Transmission India Limited4330leakage in BFP-A discharge valve and thereafter coal shortage from 10.01.1814-12-201708:43-
10APL MundraGujaratAdani Transmission India Limited5660APH Á & thereafter withheld from 15.11.2017 due to coal shortage.01-11-201723:43-
11APL MundraGujaratAdani Transmission India Limited6660Turbine bearing temperature high & thereafter withheld from 15.11.2017 due to coal shortage.20-10-201720:20-
12GPPCGujaratGSECL1351NON_AVAILABILITY OF GAS23-05-201819:45-
13SLPPGujaratGSECL3125BTL25-05-201801:00-
14APL MundraGujaratAdani Transmission India Limited7660Coal shortage28-02-201823:10-
15KLTPSGujaratGSECL170COAL MILL PROBLEM25-05-201811:35-
16EPGLGujaratESSAR2600coal shortage 24-10-201720:25-
17Satpura IVMadhya PradeshMPPGCL10250flame failure27-05-201822:38-
18Satpura IIMadhya PradeshMPPGCL7210coal shortage26-05-201810:00-
19Satpura IIMadhya PradeshMPPGCL6200ETL21-05-201800:01-
20Satpura IIIMadhya PradeshMPPGCL8210COAL SHORTAGE27-05-201812:39-
21SingajiMadhya PradeshMPPGCL1600WATER WALL TUBE LEAKAGE;delared out on coal shortage since 00:00hrs of 25-05-201821-05-201821:45-
22ChandrapurMaharashtraMAHAGENCO4210water shortage03-12-201714:17-
23KoradiMaharashtraMAHAGENCO7210Poor coal receipt 07-01-201817:00-
24ChandrapurMaharashtraMAHAGENCO3210water shortage03-12-201701:35-
25ChandrapurMaharashtraMAHAGENCO6500WATER SHORTAGE; AOH works are also being carried out since 01-02-201804-01-201813:30-
26APML TirodaMaharashtraAdani Transmission India Limited5660bottom ash hopper developed crack and heavy water leakage and thereafter withheld from 02.05.18 for coal shortage. 24-04-201808:53-
27BhusawalMaharashtraMAHAGENCO3210Taken out to save coal as IEPL -1 synchronized21-05-201818:46-
28UranMaharashtraMAHAGENCO8108Thrust bearing tripped25-03-201806:25-
29RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270Coal shortage06-05-201818:00-
30KhaparkhedaMaharashtraMAHAGENCO5500BTL26-05-201819:42-
31URAN B0MaharashtraMAHAGENCO1120DUE TO OUTAGE OF UNIT-7 AND UNIT-812-05-201819:16-
32UranMaharashtraMAHAGENCO7108GAS SHORTAGE12-05-201819:30-
33VIPLMaharashtraMAHAGENCO1300coal shortage01-04-201800:26-
34RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270Coal shortage01-05-201800:00-
 Sub Total(SS)11202 
Total Forced Outage (CS+SS): 18697

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
51117495126064784112021598628592

Generating Units Revived during last day which were out before 27-05-18
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1TAPSMaharashtraNPCIL3540Unit withdrawn due to problem in reactor; converted into Bienniel shut down for maintenance02-05-201820:0127-05-201803:31
2GandharGujaratNTPCGT ST 1219Due to non-availability of gas26-05-201823:4927-05-201806:00
 Sub Total(CS) 759 
  State Sector (SS)
1JP BinaMadhya PradeshMadhya Pradesh2250Coal Shortage16-05-201800:0627-05-201819:14
2GPECGujaratGujarat2218RSD22-05-201815:2127-05-201822:05
3KORBA(E)ChhattisgarhChattisgarh5120boiler tube leakage26-05-201814:1527-05-201820:45
 Sub Total(SS) 588 
Total (CS+SS): 1347

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1DGENGujaratTorrent Power52400RSD25-11-201620:00-
2DGENGujaratTorrent Power53400RSD23-12-201619:12-
3JPL Stg-IIChhattisgarhJindal power4600RSD05-01-201821:18-
4KawasGujaratNTPCGT ST 2A164RSD26-05-201800:20-
5GandharGujaratNTPCGT ST 3219RSD27-05-201806:00-
6GandharGujaratNTPCGT ST 1219RSD27-05-201806:00-
 Sub Total(CS) 2002 
  State Sector (SS)
1WPCLMaharashtraMaharashtra1135RSD/No PPA16-02-201617:03-
2WPCLMaharashtraMaharashtra2135RSD/No PPA29-02-201621:46-
3UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
4PIONEER(262+127)MaharashtraMaharashtra1388RSD07-02-201717:45-
5GSEGGujaratGujarat278RSD20-05-201806:00-
6GSEGGujaratGujarat178RSD21-05-201815:44-
7DGBPGujaratGujarat1107RSD21-05-201820:54-
8DGBPGujaratGujarat3375RSD24-05-201816:00-
9GSEG STAGE IIGujaratGujarat1351RSD25-05-201812:31-
10UTRAN STG IIGujaratGujarat1375RSD27-05-201809:43-
 Sub Total(S S) 2404 
Total Low Demand Outage (CS+SS): 4406