Select Date
Generation Outage Details
Report for Date 18-01-2018 Date of Reporting 19-01-2018
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1Korba STPSChhattisgarhNTPC2200AOH02-01-201801:29-
2GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685NO SCHEDULE;GMR intimated no PPA on 10-09-201722-07-201702:00-
3JPL Stg-IIChhattisgarhJindal power4600due to no schedule availability05-01-201821:18-
4JPL Stg-IIChhattisgarhJindal power3600LESS SCHEDULE28-11-201700:00-
5RKM PowerChhattisgarhRKMPPL1360Less schedule10-01-201816:03-
6GandharGujaratNTPCGT ST 3219Special inspection 19-12-201700:0003-01-2018
7KawasGujaratNTPCGT 1A106RSD15-01-201817:00-
8KawasGujaratNTPCGT 1B106RSD15-01-201817:00-
9DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
10DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
11DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
12KawasGujaratNTPCST 1C116.10RSD16-01-201800:00-
13SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
14SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
15SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
16SSP RBPH(Hy)GujaratSSP5200Low reservoir level; unit-5 is on AOH since 09:00hrs/01.12.201701-07-201700:30-
17SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
18SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
19RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
20TAPSMaharashtraNPCIL2160For commissioning work of containment filtered venting system, containment inerting system.26-12-201710:5110-02-2018
21RGPPLMaharashtraRGPPL3B332unit change over; gas shortage17-01-201813:21-
22TAPSMaharashtraNPCIL1160Refuelling & Containment inerting system is being installed04-06-201719:0915-03-2018
23RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
24IEPLMaharashtraIEPL1270no schedule30-12-201723:58-
25RGPPLMaharashtraRGPPL3A332UNIT CHANGE OVER; GAS SHORTAGE13-12-201716:57-
 Sub Total(CS)  7286.10 
  State Sector (SS)
1GIPCL STGGujaratGSECL2165RSD18-01-201809:03-
2GPECGujaratGSECL3218RSD18-01-201819:32-
3AECOGujaratTorrent PowerC60RSD01-06-201519:50-
4UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
5DGBPGujaratGSECL3375RSD27-10-201706:00-
6GSEGGujaratGSECL178RSD28-10-201700:00-
7GSEGGujaratGSECL278RSD28-10-201700:00-
8SUGENGujaratTorrent Power2382RSD14-01-201800:24-
9DGBPGujaratGSECL1107RSD06-01-201815:05-
10WanakboriGujaratGSECL2210AOH08-01-201812:49-
11GPECGujaratGSECL1218RSD12-01-201812:28-
12Hazira ExtGujaratGSECL1351plant shut down15-01-201811:15-
13GPECGujaratGSECL2218RSD17-01-201819:28-
14PIONEER(262+127)MaharashtraMAHAGENCO1388low schedule 07-02-201717:45-
15DahanuMaharashtraMAHAGENCO2250AOH 06-01-201800:4604-02-2018
16JaigadMaharashtraMAHAGENCO2300NO SCHEDULE02-12-201700:00-
17WPCLMaharashtraMAHAGENCO2135change over against unit-3 as per scheduled dispatch29-02-201621:46-
18KoradiMaharashtraMAHAGENCO6210Renovation & Modification Work20-03-201501:02-
19PARLIMaharashtraMAHAGENCO5210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201606-07-201514:55-
20PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
21ChandrapurMaharashtraMAHAGENCO8500AOH16-12-201700:18-
22TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
23WPCLMaharashtraMAHAGENCO1135Low Schedule16-02-201617:03-
 Sub Total(SS) 5680 
Total Planned Outage (CS+SS): 12966.10

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1JPL Stg-IChhattisgarhJindal power3250COAL SHORTAGE17-11-201721:44-
2RKM PowerChhattisgarhRKMPPL2360Coal Shortage21-11-201719:50-
3BALCO(300 MW)ChhattisgarhBALCO2300ID fan problem07-11-201700:16-
4JPL Stg-IChhattisgarhJindal power1250Coal shortage18-01-201800:00-
5JPL Stg-IChhattisgarhJindal power4250Due to Coal Shortage.24-09-201700:00-
6KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated/maintenance22-05-201722:12-
7VandanaChhattisgarhVandana1135BTL09-01-201515:00-
8SCPLChhattisgarhACBIL150turbine vibration28-12-201722:05-
9KAPSGujaratNPCIL2220NUCLEAR REACTOR SIDE PROB01-07-201514:0901-12-2018
10KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-10-2018
11VSTPSMadhya PradeshNTPC12500TG bearing vibration high.17-01-201819:35-
12GHATGHARMaharashtraMAHAGENCO2125RBDV LEAKAGE 28-06-201700:01-
13MOUDAMaharashtraNTPC4660Coal shortage05-01-201815:29-
 Sub Total(CS) 3920 
  State Sector (SS)
1KORBA(E)ChhattisgarhCSPGCL5120BTL09-01-201810:15-
2KORBA(E)ChhattisgarhCSPGCL250Mill fan problem23-10-201720:53-
3KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
4APL MundraGujaratAdani Transmission India Limited6660Turbine bearing temperature high & thereafter withheld from 15.11.2017 due to coal shortage.20-10-201720:20-
5BECLGujaratGSECL1250lignite shortage17-01-201807:54-
6KLTPSGujaratGSECL475Right side seal pot leakage 17-01-201813:31-
7APL MundraGujaratAdani Transmission India Limited5660APH Á & thereafter withheld from 15.11.2017 due to coal shortage.01-11-201723:43-
8APL MundraGujaratAdani Transmission India Limited4330leakage in BFP-A discharge valve and thereafter coal shortage from 10.01.1814-12-201708:43-
9SLPPGujaratGSECL2125Boiler tube leakage16-01-201800:40-
10KLTPSGujaratGSECL170BTL04-01-201815:42-
11EPGLGujaratESSAR1600condenser vacuum problem28-12-201706:09-
12APL MundraGujaratAdani Transmission India Limited1330condenser tube leakage07-01-201806:46-
13EPGLGujaratESSAR2600coal shortage 24-10-201720:25-
14BECLGujaratGSECL2250DRUM LEVEL HIGH; LIGNITE SHORTAGE22-08-201716:34-
15GPPCGujaratGSECL2351gas shortage14-01-201818:00-
16GPPCGujaratGSECL1351gas shortage14-01-201818:00-
17Satpura IIMadhya PradeshMPPGCL6200Coal shortage18-01-201815:15-
18Satpura IIIMadhya PradeshMPPGCL9210SPARKING ON GT WHILE SYNCHRONIZING FROM AOHDEVELOPED INTO FIRE24-08-201721:05-
19AmarkantakMadhya PradeshMPPGCL3120Fire Caught in Turbine Floor12-01-201500:25-
20AmarkantakMadhya PradeshMPPGCL4120Turbine Vibration High30-04-201411:13-
21APML TirodaMaharashtraAdani Transmission India Limited2660HPBP Bonnet leakage02-01-201815:26-
22ChandrapurMaharashtraMAHAGENCO3210water shortage03-12-201701:35-
23UranMaharashtraMAHAGENCO8108TURBINE VIBRATION04-01-201819:38-
24ChandrapurMaharashtraMAHAGENCO6500WATER SHORTAGE04-01-201813:30-
25Dhariwal STUMaharashtraDhariwal Infrastructure Ltd1300Drum level high27-10-201717:31-
26KoradiMaharashtraMAHAGENCO7210Poor coal receipt 07-01-201817:00-
27APML TirodaMaharashtraAdani Transmission India Limited5660Bunkering problem18-01-201823:08-
28RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270COAL SHORTAGE17-09-201700:03-
29KhaparkhedaMaharashtraMAHAGENCO3210Poor Coal Receipt 12-09-201700:00-
30BhusawalMaharashtraMAHAGENCO3210poor coal receive 11-01-201823:33-
31ParasMaharashtraMAHAGENCO4250Water Shortage12-01-201800:01-
32NasikMaharashtraMAHAGENCO5210pa fan problem06-01-201806:30-
33PARLIMaharashtraMAHAGENCO7250COAL SHORTAGE03-12-201723:35-
34ChandrapurMaharashtraMAHAGENCO4210water shortage03-12-201714:17-
 Sub Total(SS)9780 
Total Forced Outage (CS+SS): 13700

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
7286.10392011206.10568097801546026666.10

Generating Units Revived during last day which were out before 18-01-18
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1CGPLGujaratCGPL_UMPP50830BTL14-01-201810:1318-01-201802:52
 Sub Total(CS) 830 
  State Sector (SS)
1UTRAN STG IIGujaratGujarat1375RSD / Costly generation08-01-201819:2518-01-201814:55
2SingajiMadhya PradeshMadhya Pradesh1600Water valve tube leakage15-01-201811:2518-01-201812:11
3Satpura IIMadhya PradeshMadhya Pradesh6200Boiler tube leakage16-01-201804:5218-01-201815:15
4GIPCL STGGujaratGujarat2165RSD16-01-201816:5818-01-201807:51
5Sanjay Gandhi TPSMadhya PradeshMadhya Pradesh5500Water valve tube leakage16-01-201822:1518-01-201813:53
6KORBA(W) CSPGCL ChhattisgarhChattisgarh3210BTL17-01-201805:3318-01-201801:03
7GPECGujaratGujarat3218RSD17-01-201819:3318-01-201808:32
 Sub Total(SS) 2268 
Total (CS+SS): 3098

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
2DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
3DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
4GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685NO SCHEDULE;GMR intimated no PPA on 10-09-201722-07-201702:00-
5JPL Stg-IIChhattisgarhJindal power3600LESS SCHEDULE28-11-201700:00-
6IEPLMaharashtraIEPL1270no schedule30-12-201723:58-
7JPL Stg-IIChhattisgarhJindal power4600due to no schedule availability05-01-201821:18-
8RKM PowerChhattisgarhRKMPPL1360Less schedule10-01-201816:03-
9KawasGujaratNTPCGT 1A106RSD15-01-201817:00-
10KawasGujaratNTPCGT 1B106RSD15-01-201817:00-
11KawasGujaratNTPCST 1C116.10RSD16-01-201800:00-
 Sub Total(CS) 4043.10 
  State Sector (SS)
1AECOGujaratTorrent PowerC60RSD01-06-201519:50-
2WPCLMaharashtraMaharashtra1135Low Schedule16-02-201617:03-
3UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
4PIONEER(262+127)MaharashtraMaharashtra1388low schedule 07-02-201717:45-
5DGBPGujaratGujarat3375RSD27-10-201706:00-
6GSEGGujaratGujarat278RSD28-10-201700:00-
7GSEGGujaratGujarat178RSD28-10-201700:00-
8JaigadMaharashtraMaharashtra2300NO SCHEDULE02-12-201700:00-
9DGBPGujaratGujarat1107RSD06-01-201815:05-
10GPECGujaratGujarat1218RSD12-01-201812:28-
11SUGENGujaratTorrent Power2382RSD14-01-201800:24-
12GPECGujaratGujarat2218RSD17-01-201819:28-
13GIPCL STGGujaratGujarat2165RSD18-01-201809:03-
14GPECGujaratGujarat3218RSD18-01-201819:32-
 Sub Total(S S) 3104 