Select Date
Generation Outage Details
Report for Date 25-04-2019 Date of Reporting 26-04-2019
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1SKS PowerChhattisgarhSKS1300Low schedule/Maintenance works03-04-201922:58-
2GandharGujaratNTPC4224.29RSD16-04-201916:22-
3KawasGujaratNTPCGT 2B106RSD14-04-201910:13-
4Gandhar GT 1GujaratNTPC1144.30RSD04-04-201901:43-
5SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
6SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
7SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
8SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
9SSP RBPH(Hy)GujaratSSP5200Low reservoir level; unit-5 is on AOH since 09:00hrs/01.12.201701-07-201700:30-
10KawasGujaratNTPCGT 2A106RSD24-04-201909:24-
11KawasGujaratNTPCST 2C116.10RSD24-04-201909:15-
12Gandhar GT 3GujaratNTPC3144.30RSD16-04-201918:06-
13DGENGujaratTorrent Power51400RSD21-04-201900:16-
14Gandhar GT 2GujaratNTPC2144.30RSD29-03-201917:51-
15SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
16Solapur STPSMaharashtraNTPC1660RSD14-11-201800:23-
17Solapur STPSMaharashtraNTPC2660RSD, less requisition (unit on Commercial operation since 00:00hrs of 30-03-2019)28-03-201922:44-
18RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
19RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
20RGPPLMaharashtraRGPPL2A332unit change over; less gas fuel18-04-201900:03-
21RGPPLMaharashtraRGPPL2B332unit change over; less gas fuel15-04-201918:30-
 Sub Total(CS)  5509.29 
  State Sector (SS)
1GPPCGujaratGSPC2351RSD17-10-201820:47-
2UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
3GIPCL STGGujaratGSECL2165No purchase from 1st March 1801-03-201800:00-
4GPEC GTGujaratTorrent Power3138No schedule(PPA expired)10-12-201811:36-
5GPEC GTGujaratTorrent Power1138No schedule(PPA expired)10-12-201812:34-
6GPEC GTGujaratTorrent Power2138No schedule(PPA expired)10-12-201818:55-
7GSEGGujaratGSPC178RSD11-10-201822:26-
8BECLGujaratGSECL2250BOILER INSPECTION/Raw water shortage20-10-201822:49-
9UTRAN STG IIGujaratGSECL1375RSD22-04-201908:27-
10DGBPGujaratGSECL2112AOH04-04-201905:53-
11DGBPGujaratGSECL3375RSD15-04-201908:33-
12GSEG STAGE IIGujaratGSPC1351RSD20-04-201923:15-
13SingajiMadhya PradeshMPPGCL3660Taken out for PG Test.10-04-201900:00-
14RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270Less schedule24-04-201900:00-
15PIONEER(262+127)MaharashtraMAHAGENCO1388RSD07-02-201717:45-
16PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
17PARLIMaharashtraMAHAGENCO5210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201606-07-201514:55-
18PARLIMaharashtraMAHAGENCO7250RSD12-12-201800:00-
19RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270RSD21-04-201900:00-
20RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270Less schedule20-04-201900:01-
21URAN B0MaharashtraMAHAGENCO1120Transformer shifting work08-09-201812:19-
22WPCLMaharashtraMAHAGENCO3135AOH01-11-201800:28-
23WPCLMaharashtraMAHAGENCO4135RSD15-12-201800:00-
24BhusawalMaharashtraMAHAGENCO3210RSD14-12-201803:00-
25PARLIMaharashtraMAHAGENCO6250RSD12-12-201800:00-
26RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd4270RSD20-12-201800:00-
27WPCLMaharashtraMAHAGENCO2135RSD27-11-201800:00-
28TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
 Sub Total(SS) 7136 
Total Planned Outage (CS+SS): 12645.29

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated/maintenance22-05-201722:12-
2VandanaChhattisgarhVandana1135BTL09-01-201515:00-
3JPL Stg-IChhattisgarhJindal power3250Condenser tube leakage.; under Coal Shortage w.e.f 00:00hrs/18-04-201915-04-201912:15-
4JPL Stg-IIChhattisgarhJindal power4600withdrawn to attend hot spot on R-phase Bushing terminal; coal shortage w.e.f 00:00hrs/18-04-201911-04-201907:30-
5RKM PowerChhattisgarhRKMPPL4360Commercial operation declared from 00:00hrs of 20-03-2019; kept out on coal shortage20-03-201900:00-
6RKM PowerChhattisgarhRKMPPL2360coal shortage 31-01-201915:57-
7GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685Turbine casing drain heavy leakage17-04-201823:39-
8RKM PowerChhattisgarhRKMPPL1360Coal Shortage04-01-201912:57-
9BALCO(300 MW)ChhattisgarhBALCO2300PA Fan 2B Inspection25-04-201900:36-
10JPL Stg-IIChhattisgarhJindal power1600Condenser tube leakage./coal shortage16-03-201902:07-
11JPL Stg-IChhattisgarhJindal power1250Coal shortage24-10-201800:00-
12JPL Stg-IChhattisgarhJindal power2250Condenser tube leakage/Coal shortage since 00:00hrs of 02-09-201830-08-201821:15-
13KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-05-2019
14GadarwadaMadhya PradeshNTPC1800due to mechanical seal Leakage in both TDBFPs08-04-201914:52-
15SasanMadhya PradeshSASAN_UMPP5660Electrical fault.Upon inspection huge leakage in Boiler separator safety Valve was observed.25-04-201903:41-
16TAPSMaharashtraNPCIL1160Due to PRM high flux.(reactor side problem)21-04-201913:43-
 Sub Total(CS) 6590 
  State Sector (SS)
1KORBA(E)ChhattisgarhCSPGCL350Super heater problem12-09-201812:42-
2KORBA(W) CSPGCL ChhattisgarhCSPGCL3210Y Phase jumper broken 24-02-201922:43-
3KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
4KORBA(E)ChhattisgarhCSPGCL250Mill fan problem23-10-201720:53-
5KORBA(E)ChhattisgarhCSPGCL450Due to outage of mill14-09-201815:46-
6GSEGGujaratGSPC278Turbine bearing vibration high 05-10-201819:38-
7GPECGujaratCLPIPL4241High pressure control valve problem06-12-201816:36-
8OPGSGujaratGSECL1150Annual Maintenance24-02-201923:59-
9AECOGujaratTorrent PowerE120BTL22-04-201902:54-
10BECLGujaratGSECL1250Fire in bunker feeding system.29-03-201919:52-
11KLTPSGujaratGSECL375BTL19-04-201913:47-
12OPGSGujaratGSECL2150Boiler Mft08-04-201909:05-
13EPGLGujaratESSAR2600coal shortage 24-10-201720:25-
14DGBPGujaratGSECL1107TRIPPED DUE TO TRIPPING OF EVACUATION LINES/LATER TURBINE GEAR PROBLEM DEVELOPED25-09-201812:54-
15Satpura IIIMadhya PradeshMPPGCL8210ID Fan problem08-04-201903:15-
16Satpura IIIMadhya PradeshMPPGCL9210BTL25-04-201900:46-
17Dhariwal STUMaharashtraDhariwal Infrastructure Ltd1300Economiser ash evacuation problem18-04-201900:15-
18UranMaharashtraMAHAGENCO7108Compressor search protection20-07-201812:53-
19VIPLMaharashtraMAHAGENCO1300Coal shortage29-12-201800:30-
20ChandrapurMaharashtraMAHAGENCO6500Rotor earth fault20-02-201922:06-
21RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270Reason awaited24-04-201914:01-
22KoradiMaharashtraMAHAGENCO7210Poor coal receipt19-01-201918:21-
23ChandrapurMaharashtraMAHAGENCO4210Furnace draft pressure high17-04-201913:53-
24VIPLMaharashtraMAHAGENCO2300COAL SHORTAGE17-01-201900:15-
25IEPLMaharashtraIEPL1270Coal Shortage28-08-201821:26-
26UranMaharashtraMAHAGENCO8108heat rate high08-09-201822:08-
27KhaparkhedaMaharashtraMAHAGENCO1210Poor Coal Receipt23-04-201920:32-
28NasikMaharashtraMAHAGENCO3210BTL19-04-201912:22-
29WPCLMaharashtraMAHAGENCO1135fLAME fAILURE25-11-201804:48-
 Sub Total(SS)5732 
Total Forced Outage (CS+SS): 12322

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
5509.29659012099.29713657321286824967.29

Generating Units Revived during last day which were out before 25-04-19
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1CGPLGujaratCGPL_UMPP10830BTL16-04-201917:3425-04-201913:56
 Sub Total(CS) 830 
  State Sector (SS)
1GPPCGujaratGSPC1351RSD15-04-201908:5125-04-201916:40
 Sub Total(SS) 351 
Total (CS+SS): 1181

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1Solapur STPSMaharashtraNTPC1660RSD14-11-201800:23-
2Solapur STPSMaharashtraNTPC2660RSD, less requisition (unit on Commercial operation since 00:00hrs of 30-03-2019)28-03-201922:44-
3Gandhar GT 2GujaratNTPC2144.30RSD29-03-201917:51-
4SKS PowerChhattisgarhSKS1300Low schedule/Maintenance works03-04-201922:58-
5Gandhar GT 1GujaratNTPC1144.30RSD04-04-201901:43-
6KawasGujaratNTPCGT 2B106RSD14-04-201910:13-
7GandharGujaratNTPC4224.29RSD16-04-201916:22-
8Gandhar GT 3GujaratNTPC3144.30RSD16-04-201918:06-
9DGENGujaratTorrent Power51400RSD21-04-201900:16-
10KawasGujaratNTPCST 2C116.10RSD24-04-201909:15-
11KawasGujaratNTPCGT 2A106RSD24-04-201909:24-
 Sub Total(CS) 3005.29 
  State Sector (SS)
1UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
2PIONEER(262+127)MaharashtraMaharashtra1388RSD07-02-201717:45-
3GSEGGujaratGSPC178RSD11-10-201822:26-
4GPPCGujaratGSPC2351RSD17-10-201820:47-
5WPCLMaharashtraMaharashtra2135RSD27-11-201800:00-
6GPEC GTGujaratTorrent Power3138No schedule(PPA expired)10-12-201811:36-
7GPEC GTGujaratTorrent Power1138No schedule(PPA expired)10-12-201812:34-
8GPEC GTGujaratTorrent Power2138No schedule(PPA expired)10-12-201818:55-
9PARLIMaharashtraMaharashtra7250RSD12-12-201800:00-
10PARLIMaharashtraMaharashtra6250RSD12-12-201800:00-
11BhusawalMaharashtraMaharashtra3210RSD14-12-201803:00-
12WPCLMaharashtraMaharashtra4135RSD15-12-201800:00-
13RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd4270RSD20-12-201800:00-
14DGBPGujaratGSECL3375RSD15-04-201908:33-
15RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270Less schedule20-04-201900:01-
16GSEG STAGE IIGujaratGSPC1351RSD20-04-201923:15-
17RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270RSD21-04-201900:00-
18UTRAN STG IIGujaratGSECL1375RSD22-04-201908:27-
19RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270Less schedule24-04-201900:00-
 Sub Total(S S) 4774 
Total Low Demand Outage (CS+SS): 7779.29