Generation Outage Details
Report for Date 19-01-2019 Date of Reporting 20-01-2019
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1SIPAT IIChhattisgarhNTPC4500AOH30-12-201800:11-
2ACBILChhattisgarhACBIL2135withdrawn on BTL/later converted to AOH30-12-201809:30-
3RKM PowerChhattisgarhRKMPPL1360Coal Shortage04-01-201912:57-
4BALCO(300 MW)ChhattisgarhBALCO3300Annual overhauling11-01-201923:30-
5Essar(Mahan)ChhattisgarhESSAR2600Low schedule08-11-201800:02-
6MCCPLChhattisgarhACBIL1300Resolving ESP FIELDS & ASH CONVEYING Problem. 02-01-201900:00-
7KawasGujaratNTPCST 1C116.10RSD less schedule on RLNG21-11-201819:53-
8DGENGujaratTorrent Power51400NO SCHEDULE(NO PPA)22-05-201800:00-
9Gandhar GT 2GujaratNTPC2144.30RSD12-01-201913:30-
10SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
11SSP RBPH(Hy)GujaratSSP5200Low reservoir level; unit-5 is on AOH since 09:00hrs/01.12.201701-07-201700:30-
12SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
13SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
14Gandhar GT 3GujaratNTPC3144.30RSD11-01-201913:14-
15KawasGujaratNTPCGT 1A106RSD12-01-201909:58-
16KawasGujaratNTPCGT 1B106RSD10-01-201913:18-
17SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
18DGENGujaratTorrent Power52400NO SCHEDULE(NO PPA)25-11-201620:00-
19SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
20DGENGujaratTorrent Power53400NO SCHEDULE(NO PPA)23-12-201619:12-
21RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
22RGPPLMaharashtraRGPPL3B332unit change over;less gas availability27-11-201815:20-
23RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
24Solapur STPSMaharashtraNTPC1660RSD14-11-201800:23-
25RGPPLMaharashtraRGPPL3A332unit change over;less gas availability; unit tripped earlier on CW pump trip.28-11-201810:45-
 Sub Total(CS)  7175.70 
  State Sector (SS)
1Marwa TPSChhattisgarhCSPGCL1500AOH15-01-201922:44-
2KORBA EAST EXT(DSPM)ChhattisgarhCSPGCL1250AOH05-01-201923:25-
3DGBPGujaratGSECL3375RSD05-11-201814:22-
4UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
5GIPCL STGGujaratGSECL2165No purchase from 1st March 1801-03-201800:00-
6GPEC GTGujaratTorrent Power3138No schedule(PPA expired)10-12-201811:36-
7GPPCGujaratGSECL1351RSD.02-11-201820:40-
8GPEC GTGujaratTorrent Power1138No schedule(PPA expired)10-12-201812:34-
9GPEC GTGujaratTorrent Power2138No schedule(PPA expired)10-12-201818:55-
10GPPCGujaratGSECL2351RSD17-10-201820:47-
11GSEGGujaratGSECL178RSD11-10-201822:26-
12BECLGujaratGSECL2250BOILER INSPECTION20-10-201822:49-
13SUGENGujaratTorrent Power1382RSD12-01-201919:44-
14GSEG STAGE IIGujaratGSECL1351RSD10-01-201920:38-
15GandhinagarGujaratGSECL4210AOH29-12-201814:53-
16DGBPGujaratGSECL2112RSD19-01-201923:00-
17UTRAN STG IIGujaratGSECL1375RSD15-01-201919:39-
18PARLIMaharashtraMAHAGENCO7250Zero schedule12-12-201800:00-
19RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270RSD28-12-201819:30-
20URAN B0MaharashtraMAHAGENCO1120Transformer shifting work08-09-201812:19-
21PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
22PARLIMaharashtraMAHAGENCO5210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201606-07-201514:55-
23WPCLMaharashtraMAHAGENCO2135No schedule27-11-201800:00-
24WPCLMaharashtraMAHAGENCO3135AOH01-11-201800:28-
25RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270RSD14-12-201816:30-
26KOYNA ST-IVMaharashtraMAHAGENCO2250Routine Maintenance work.14-01-201909:40-
27TrombayMaharashtraMAHAGENCO5500AOH11-01-201923:56-
28WPCLMaharashtraMAHAGENCO4135RSD15-12-201800:00-
29RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270Zero Schedule18-01-201919:30-
30RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270RSD27-12-201819:30-
31DahanuMaharashtraMAHAGENCO1250COH23-12-201806:06-
32NasikMaharashtraMAHAGENCO3210RSD09-01-201919:33-
33BhusawalMaharashtraMAHAGENCO3210No Schedule14-12-201803:00-
34PARLIMaharashtraMAHAGENCO6250Zero Schedule12-12-201800:00-
35RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd4270RSD20-12-201800:00-
36PARLIMaharashtraMAHAGENCO8250Zero Schedule12-01-201912:00-
37PIONEER(262+127)MaharashtraMAHAGENCO1388RSD07-02-201717:45-
38TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
 Sub Total(SS) 9899 
Total Planned Outage (CS+SS): 17074.70

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1SKS PowerChhattisgarhSKS2300 All MILL got tripped due to Boiler mcc cable fault.01-01-201913:20-
2KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated/maintenance22-05-201722:12-
3GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685Coal shortage28-11-201800:12-
4KSKChhattisgarhKSK Mahanadi Power Co Ltd3600APH problem./Coal shortage since 00:00hrs/15-10-201803-10-201802:29-
5VandanaChhattisgarhVandana1135BTL09-01-201515:00-
6KSKChhattisgarhKSK Mahanadi Power Co Ltd4600Coal Shortage04-01-201917:17-
7Korba STPSChhattisgarhNTPC7500BTL18-01-201912:58-
8JPL Stg-IIChhattisgarhJindal power4600Coal feeding problem/Coal shortage29-12-201812:38-
9SCPLChhattisgarhACBIL250BTL19-01-201922:47-
10JPL Stg-IIChhattisgarhJindal power2600Coal Shortage08-01-201900:00-
11TRN EnergyChhattisgarhACBIL2300Coal shortage16-12-201804:00-
12NSPCLChhattisgarhNSPCL1250Generator differential protection operated18-11-201809:14-
13JPL Stg-IChhattisgarhJindal power1250Coal shortage24-10-201800:00-
14JPL Stg-IChhattisgarhJindal power2250Condenser tube leakage/Coal shortage since 00:00hrs of 02-09-201830-08-201821:15-
15GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685Turbine casing drain heavy leakage17-04-201823:39-
16RKM PowerChhattisgarhRKMPPL2360Coal shortage17-10-201818:33-
17KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-05-2019
18KawasGujaratNTPCGT 2B106Bearing temperature high18-01-201922:42-
19SasanMadhya PradeshSASAN_UMPP4660BTL19-01-201904:50-
20GadarwadaMadhya PradeshNTPC1800 IP wet steam protection operated24-11-201803:13-
 Sub Total(CS) 8551 
  State Sector (SS)
1KORBA(E)ChhattisgarhCSPGCL250Mill fan problem23-10-201720:53-
2KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
3KORBA(E)ChhattisgarhCSPGCL450Due to outage of mill14-09-201815:46-
4Marwa TPSChhattisgarhCSPGCL2500Ash handling problem11-01-201921:10-
5KORBA(E)ChhattisgarhCSPGCL350Super heater problem12-09-201812:42-
6KLTPSGujaratGSECL170Bottom Ash chain problem19-01-201909:46-
7GandhinagarGujaratGSECL5210Flame failure19-01-201909:50-
8EPGLGujaratESSAR1600Coal shortage23-01-201818:51-
9EPGLGujaratESSAR2600coal shortage 24-10-201720:25-
10DGBPGujaratGSECL1107TRIPPED DUE TO TRIPPING OF EVACUATION LINES/LATER TURBINE GEAR PROBLEM DEVELOPED25-09-201812:54-
11GPECGujaratGSECL4241High pressure control valve problem06-12-201816:36-
12SingajiMadhya PradeshMPPGCL2600Boiler Circulating Water Pump 2A problem17-01-201900:00-
13Dhariwal STUMaharashtraDhariwal Infrastructure Ltd1300Coal Shortage12-01-201910:50-
14KORADI-2(MSEDCL)MaharashtraMAHAGENCO10660Poor coal received15-01-201923:25-
15WPCLMaharashtraMAHAGENCO1135fLAME fAILURE25-11-201804:48-
16VIPLMaharashtraMAHAGENCO2300COAL SHORTAGE17-01-201900:15-
17VIPLMaharashtraMAHAGENCO1300Coal shortage29-12-201800:30-
18UranMaharashtraMAHAGENCO8108heat rate high08-09-201822:08-
19KoradiMaharashtraMAHAGENCO7210Poor coal receipt19-01-201918:21-
20UranMaharashtraMAHAGENCO7108Compressor search protection20-07-201812:53-
21ParasMaharashtraMAHAGENCO3250GT PROTECTION OPERATED.15-09-201800:55-
22IEPLMaharashtraIEPL1270Coal Shortage28-08-201821:26-
 Sub Total(SS)5769 
Total Forced Outage (CS+SS): 14320

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
7175.70855115726.70989957691566831394.70

Generating Units Revived during last day which were out before 19-01-19
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
--No Outages--
 Sub Total(CS) 0 
  State Sector (SS)
1DGBPGujaratGujarat2112RSD18-01-201922:5719-01-201906:11
 Sub Total(SS) 112 
Total (CS+SS): 112

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1DGENGujaratTorrent Power52400NO SCHEDULE(NO PPA)25-11-201620:00-
2DGENGujaratTorrent Power53400NO SCHEDULE(NO PPA)23-12-201619:12-
3DGENGujaratTorrent Power51400NO SCHEDULE(NO PPA)22-05-201800:00-
4Essar(Mahan)ChhattisgarhESSAR2600Low schedule08-11-201800:02-
5Solapur STPSMaharashtraNTPC1660RSD14-11-201800:23-
6KawasGujaratNTPCST 1C116.10RSD less schedule on RLNG21-11-201819:53-
7KawasGujaratNTPCGT 1B106RSD10-01-201913:18-
8Gandhar GT 3GujaratNTPC3144.30RSD11-01-201913:14-
9KawasGujaratNTPCGT 1A106RSD12-01-201909:58-
10Gandhar GT 2GujaratNTPC2144.30RSD12-01-201913:30-
 Sub Total(CS) 3076.70 
  State Sector (SS)
1UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
2PIONEER(262+127)MaharashtraMaharashtra1388RSD07-02-201717:45-
3GSEGGujaratGujarat178RSD11-10-201822:26-
4GPPCGujaratGujarat2351RSD17-10-201820:47-
5GPPCGujaratGujarat1351RSD.02-11-201820:40-
6DGBPGujaratGujarat3375RSD05-11-201814:22-
7WPCLMaharashtraMaharashtra2135No schedule27-11-201800:00-
8GPEC GTGujaratTorrent Power3138No schedule(PPA expired)10-12-201811:36-
9GPEC GTGujaratTorrent Power1138No schedule(PPA expired)10-12-201812:34-
10GPEC GTGujaratTorrent Power2138No schedule(PPA expired)10-12-201818:55-
11BhusawalMaharashtraMaharashtra3210No Schedule14-12-201803:00-
12RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270RSD14-12-201816:30-
13WPCLMaharashtraMaharashtra4135RSD15-12-201800:00-
14RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd4270RSD20-12-201800:00-
15RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270RSD27-12-201819:30-
16RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270RSD28-12-201819:30-
17NasikMaharashtraMaharashtra3210RSD09-01-201919:33-
18GSEG STAGE IIGujaratGujarat1351RSD10-01-201920:38-
19SUGENGujaratTorrent Power1382RSD12-01-201919:44-
20UTRAN STG IIGujaratGujarat1375RSD15-01-201919:39-
21DGBPGujaratGujarat2112RSD19-01-201923:00-
 Sub Total(S S) 5329 
Total Low Demand Outage (CS+SS): 8405.70