A. Planned Outages
S.NoStationUnit NoStateAgencyCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1JPL Stg-II3ChhattisgarhJindal power600Less Schedule17-JUN-201609:54-
2JPL Stg-II4ChhattisgarhJindal power600Taken out after COD test11-DEC-201613:59-
3GMR CHHATISGARH2ChhattisgarhGMR Chattisgarh Energy Ltd685No Schedule02-AUG-201601:10-
4GandharGT ST 2GujaratNTPC219RSD25-MAR-201715:40-
5DGEN52GujaratTorrent Power400NO SCHEDULE25-NOV-201620:00-
6SSP RBPH(Hy)1GujaratSSP200AOH for 30 Days(upto 14.04.17)15-MAR-201709:00-
7DGEN51GujaratTorrent Power400No schedule02-DEC-201619:28-
8DGEN53GujaratTorrent Power400LOW SCHEDULE23-DEC-201619:12-
9KawasGT 2BGujaratNTPC106LOW SCHEDULE/CHANGE OVER; under AOH since 00:00hrs/14-02-2017;under RSD from 00:00hrs/23-02-201722-JAN-201716:30-
10KawasST 2CGujaratNTPC116.10LOW SCHEDULE/CHANGE OVER22-JAN-201716:27-
11VSTPS5Madhya PradeshNTPC210BLR+ESP R&M27-MAR-201700:26-
12RGPPL1BMaharashtraRGPPL320Kept on Dry Preservation31-MAR-201423:00-
13RGPPL1AMaharashtraRGPPL320Kept on Dry Preservation08-JUL-201413:30-
14RGPPL2BMaharashtraRGPPL332UNIT CHANGE OVER11-FEB-201714:15-
 Sub Total(CS)  4908.10 
  State Sector (SS)
1KORBA EAST EXT(DSPM)2ChhattisgarhCSPGCL250AOH08-MAR-201723:50-
2ESSAR IPPGT 2GujaratESSAR172No Schedule22-FEB-201312:12-
3Pipavav2GujaratGSECL350RSD17-DEC-201612:32-
4AECOCGujaratTorrent Power60RSD01-JUN-201519:50-
5GSEG1GujaratGSECL78RSD04-MAY-201623:27-
6STPS1GujaratGSECL120RSD26-SEP-201618:00-
7GSEG2GujaratGSECL78RSD26-MAR-201716:27-
8ESSAR IPPGT 3GujaratESSAR172No Schedule04-MAR-201320:47-
9Gandhinagar4GujaratGSECL210RSD24-JAN-201716:45-
10Ukai5GujaratGSECL210AOH06-DEC-201623:57-
11UNOSUGEN1GujaratTorrent Power382RSD Load Regulation 04-MAR-201621:55-
12Satpura III8Madhya PradeshMPPGCL210RSD27-DEC-201611:42-
13JP Bina1Madhya PradeshMPPGCL250checking of CIRCUITS AND COMPONENTS OF protection05-MAR-201700:17-
14Singaji2Madhya PradeshMPPGCL600RSD11-MAR-201719:30-
15Satpura III9Madhya PradeshMPPGCL210RSD27-DEC-201611:44-
16RATTAN INDIA POWER(A)3MaharashtraRattan India Power Ltd270No/Zero Schedule by DISCOM29-JUN-201603:01-
17WPCL1MaharashtraMAHAGENCO135Low Schedule16-FEB-201617:03-
18WPCL2MaharashtraMAHAGENCO135change over against unit-3 as per scheduled dispatch29-FEB-201621:46-
19Trombay6MaharashtraMAHAGENCO500AOH06-MAR-201600:00-
20KORADI-2(MSEDCL)10MaharashtraMAHAGENCO660PG test on Ash handling plant07-FEB-201700:10-
21Koradi6MaharashtraMAHAGENCO210Renovation & Modification Work 20-MAR-201501:02-
22Nasik4MaharashtraMAHAGENCO210AOH (WITHDRAWN ON BTL,BUT WILL CONTINUE TO BE OUT FOR AOH)25-MAR-201705:45-
23PIONEER(262+127)1MaharashtraMAHAGENCO388low schedule 07-FEB-201717:45-
 Sub Total(SS) 5860 
Total Planned Outage (CS+SS): 10768.10

B. Forced Outages
S.NoStationUnit NoStateAgencyCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1ACBIL2ChhattisgarhACBIL135suspected Boiler tube leakage27-MAR-201713:30-
2TRN Energy1ChhattisgarhACBIL300ID fan problem19-MAR-201704:23-
3Vandana1ChhattisgarhVandana135BTL09-JAN-201515:00-
4JPL Stg-II1ChhattisgarhJindal power600BTL10-MAR-201720:40-
5ACBIL1ChhattisgarhACBIL135BTL13-MAR-201721:39-
6JPL Stg-I4ChhattisgarhJindal power250Low Schedule07-MAR-201704:57-
7KAPS2GujaratNPCIL220NUCLEAR REACTOR SIDE PROB01-JUL-201514:09-
8KawasGT 2AGujaratNTPC106low schedule; change over of units22-JAN-201710:37-
9KAPS1GujaratNPCIL220REACTOR SIDE PROBLEM11-MAR-201608:52-
10JP Nigrie2Madhya PradeshJAYPEE660TRIPPED ON MFT16-MAR-201700:59-
11Jhabua Power1Madhya PradeshJhabua Power600GENERATOR DRIVE END PEDEASTAL VIBRATION HIGH31-DEC-201612:42-
12MB Power2Madhya PradeshMPPGCL600FLAME FAILURE.16-MAY-201620:12-
13RGPPL2AMaharashtraRGPPL332Withdrawal of backup unit06-MAR-201718:05-
 Sub Total(CS) 4293 
  State Sector (SS)
1KORBA(E)3ChhattisgarhCSPGCL50FURNACE DARK09-DEC-201623:21-
2KORBA(E)5ChhattisgarhCSPGCL120BTL22-MAR-201721:35-
3GPEC3GujaratGSECL218RSD16-MAR-201719:38-
4Gandhinagar1GujaratGSECL120Long restoration period 09-APR-201601:30-
5Gandhinagar2GujaratGSECL120Long restoration period 09-APR-201601:30-
6Ukai2GujaratGSECL120Long restoration period 09-APR-201616:00-
7DGBP3GujaratGSECL375RSD15-DEC-201616:53-
8SUGEN3GujaratTorrent Power382Testing29-DEC-201613:08-
9Ukai4GujaratGSECL200RSD02-DEC-201619:49-
10EPGL1GujaratESSAR600Vacuum problem01-MAR-201706:56-
11APL Mundra2GujaratAdani Transmission India Limited330Coal shortage07-MAR-201702:01-
12Pipavav1GujaratGSECL350Generator testing work29-NOV-201600:55-
13OPGS2GujaratGSECL150Less schedule01-FEB-201700:00-
14APL Mundra6GujaratAdani Transmission India Limited660Hydrogen gas leak03-MAR-201720:46-
15EPGL2GujaratESSAR600BTL16-MAR-201714:46-
16APL Mundra3GujaratAdani Transmission India Limited330Tripped due to TG vibration high17-MAR-201722:16-
17BECL1GujaratGSECL250coal handling plant10-FEB-201722:25-
18Wanakbori6GujaratGSECL210rsd07-JAN-201719:55-
19SUGEN2GujaratTorrent Power382RSD16-FEB-201716:56-
20DGBP2GujaratGSECL112high exhaust temp20-MAR-201704:48-
21STPS2GujaratGSECL120BUNKER PROBLEM24-SEP-201613:05-
22Ukai1GujaratGSECL120EXCITATION PROBLEM07-MAY-201603:18-
23APL Mundra1GujaratAdani Transmission India Limited330Coal Shortage05-MAR-201718:58-
24GIPCL STG1GujaratGSECL145RSD10-MAR-201714:08-
25GPEC1GujaratGSECL218Gas unavailable20-MAR-201712:00-
26SLPP1GujaratGSECL125BTL19-MAR-201706:31-
27Amarkantak4Madhya PradeshMPPGCL120Turbine Vibration High30-APR-201411:13-
28Amarkantak3Madhya PradeshMPPGCL120Fire Caught in Turbine Floor12-JAN-201500:25-
29Satpura II6Madhya PradeshMPPGCL200Deaerator Problem21-FEB-201711:50-
30Satpura II7Madhya PradeshMPPGCL210RSD10-MAR-201715:00-
31Jaigad2MaharashtraMAHAGENCO300Less schedule01-DEC-201600:00-
32RATTAN INDIA POWER(A)5MaharashtraRattan India Power Ltd270RSD15-NOV-201620:00-
33Chandrapur2MaharashtraMAHAGENCO210BTL12-JAN-201604:42-
34Uran8MaharashtraMAHAGENCO108Bearing pressure very high14-AUG-201607:57-
35Khaparkheda3MaharashtraMAHAGENCO210BTL23-MAR-201719:38-
36URAN B01MaharashtraMAHAGENCO120filter clearing26-MAR-201700:30-
37PARLI5MaharashtraMAHAGENCO210Water Shortage06-JUL-201514:55-
38Chandrapur7MaharashtraMAHAGENCO500TURBINE BEARING SPARKING25-JAN-201719:32-
39Bhusawal4MaharashtraMAHAGENCO500coal bunkering problem27-MAR-201702:29-
40Bhusawal2MaharashtraMAHAGENCO210BTL14-JUN-201619:35-
41RATTAN INDIA POWER(A)2MaharashtraRattan India Power Ltd270LESS SCHEDULE16-NOV-201622:36-
42PARLI4MaharashtraMAHAGENCO210Water Shortage05-JUL-201518:45-
43WPCL4MaharashtraMAHAGENCO135SSC CHAIN BROKEN22-MAR-201700:01-
44RATTAN INDIA POWER(A)4MaharashtraRattan India Power Ltd270LESS SCHEDULE16-NOV-201621:03-
45Koradi5MaharashtraMAHAGENCO200ID fan problem05-SEP-201600:21-
46APML Tiroda4MaharashtraAdani Transmission India Limited660closing of Main Steam Stop Valve left hand side24-MAR-201722:00-
47Chandrapur1MaharashtraMAHAGENCO210BTL28-AUG-201407:15-
48Dhariwal STU1MaharashtraDhariwal Infrastructure Ltd300Turbine Vibration High28-MAY-201402:27-
 Sub Total(SS)12280 
Total Forced Outage (CS+SS): 16573

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
4908.1042939201.105860122801814027341.10

Generating Units Revived during last day which were out before 27-03-17
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1RKM PowerChhattisgarhRKMPPL1360reverse power protection operated03-MAR-201707:5827-MAR-201716:42
2MB PowerMadhya PradeshMadhya Pradesh1600PA Fan blade pitch problem26-MAR-201701:3527-MAR-201719:54
 Sub Total(CS) 960 
  State Sector (SS)
1RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270RSD/Zero Schedule17-NOV-201617:2327-MAR-201707:19
2SingajiMadhya PradeshMadhya Pradesh1600Under RSD26-JAN-201719:1027-MAR-201719:12
3KORBA(E)ChhattisgarhChattisgarh150generator turbine vibrations07-FEB-201710:3927-MAR-201700:30
4DGBPGujaratGujarat1107 High exhaust temperture 26-MAR-201720:2427-MAR-201712:21
 Sub Total(SS) 1027 
Total (CS+SS): 1987

Generating Units Tripped and Synchronized within 24 hrs (From 00:00:00 hrs to 23:59:50 hrs) of the day
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
--No Outages--
 Sub Total(CS) 0 
  State Sector (SS)
--No Outages--
 Sub Total(SS) 0 
Total (CS+SS): 0