Generation Outage Details
Report for Date 22-09-2017 Date of Reporting 23-09-2017
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685NO SCHEDULE;GMR intimated no PPA on 10-09-201722-07-201702:00-
2JPL Stg-IIChhattisgarhJindal power4600Less schedule at present; out on 24/06/17 on loss of all fuel due to heavy jerk24-06-201716:13-
3BALCO(300 MW)ChhattisgarhBALCO1300Overhauling and Low Coal Stock.24-07-201700:09-
4RKM PowerChhattisgarhRKMPPL2360Taken As per schedule22-07-201719:13-
5GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685No Schedule; GMR intimated no PPA on 10-09-201702-08-201601:10-
6JPL Stg-IIChhattisgarhJindal power3600Less Schedule17-06-201609:54-
7JPL Stg-IChhattisgarhJindal power1250RSD/coal shortage since 12-09-201725-06-201700:05-
8SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
9SSP RBPH(Hy)GujaratSSP5200Low reservoir level01-07-201700:30-
10SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
11SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
12SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
13SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
14DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
15CGPLGujaratCGPL_UMPP40830AOH11-09-201700:2910-10-2017
16DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
17KawasGujaratNTPCGT 2B106withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:56-
18DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
19GandharGujaratNTPCGT ST 3219withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:59-
20KawasGujaratNTPCGT 2A106withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:37-
21KawasGujaratNTPCST 2C116.10withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:38-
22SasanMadhya PradeshSASAN_UMPP6660AOH20-09-201705:00-
23VSTPSMadhya PradeshNTPC10500AOH05-09-201701:08-
24MB PowerMadhya PradeshMPPGCL1600COH19-09-201713:03-
25RGPPLMaharashtraRGPPL2B332for change over and less gas availability22-09-201718:51-
26TAPSMaharashtraNPCIL1160Refuelling04-06-201719:0930-11-2017
27TAPSMaharashtraNPCIL4540Bi annual maintenance and routine surveillance test23-04-201719:5530-10-2017
28RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
29RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
30RGPPLMaharashtraRGPPL3B332change over of units;gas shortage30-08-201700:02-
 Sub Total(CS)  11021.10 
  State Sector (SS)
1ALTPSGujaratGSECL1125AOH01-09-201700:5930-09-2017
2DGBPGujaratGSECL2112RSD21-09-201719:25-
3AECOGujaratTorrent PowerC60RSD01-06-201519:50-
4UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
5STPSGujaratGSECL1120RSD26-09-201618:00-
6GPPCGujaratGSECL1351CT-1 BASIN CLEANING WORK19-08-201700:00-
7KLTPSGujaratGSECL375AOH24-08-201700:5528-09-2017
8GPPCGujaratGSECL2351RSD01-06-201723:58-
9WanakboriGujaratGSECL3210AOH25-07-201700:0001-11-2017
10OPGSGujaratGSECL1150AOH20-09-201700:00-
11GPECGujaratGSECL1218RSD21-09-201714:10-
12Hazira ExtGujaratGSECL1351RSD COSTLYGENERATION22-09-201701:30-
13GPECGujaratGSECL2218Low Schedule11-09-201723:50-
14Satpura IVMadhya PradeshMPPGCL11250AOH20-07-201702:53-
15SingajiMadhya PradeshMPPGCL2600AOH02-08-201700:00-
16Sanjay Gandhi TPSMadhya PradeshMPPGCL1210AOH13-09-201723:5910-10-2017
17Satpura IIMadhya PradeshMPPGCL7210Economizer tube leakage/Coal shortage14-09-201702:20-
18PIONEER(262+127)MaharashtraMAHAGENCO1388low schedule 07-02-201717:45-
19NasikMaharashtraMAHAGENCO3210COH15-08-201700:00-
20KoradiMaharashtraMAHAGENCO6210Renovation & Modification Work/converted into RSD 20-03-201501:0201-12-2017
21TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
22ChandrapurMaharashtraMAHAGENCO4210AOH22-08-201723:5625-09-2017
23PARLIMaharashtraMAHAGENCO5210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201606-07-201514:55-
24WPCLMaharashtraMAHAGENCO1135Low Schedule16-02-201617:03-
25PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
26WPCLMaharashtraMAHAGENCO2135change over against unit-3 as per scheduled dispatch29-02-201621:46-
27Dhariwal STUMaharashtraDhariwal Infrastructure Ltd1300NO PPA01-06-201700:01-
 Sub Total(SS) 6501 
Total Planned Outage (CS+SS): 17522.10

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1JPL Stg-IIChhattisgarhJindal power1600Coal Shortage11-06-201700:0001-10-2017
2KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated22-05-201722:12-
3TRN EnergyChhattisgarhACBIL2300High vibration in ID Fan21-09-201701:11-
4VandanaChhattisgarhVandana1135BTL09-01-201515:00-
5ACBILChhattisgarhACBIL2135due to suspected boiler tube leakage.22-09-201714:03-
6KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-10-2018
7KAPSGujaratNPCIL2220NUCLEAR REACTOR SIDE PROB01-07-201514:0901-12-2018
8JP NigrieMadhya PradeshJAYPEE2660Tube Leakage in super heater area of Boiler17-09-201704:11-
9Jhabua PowerMadhya PradeshJhabua Power1600Coal Shortage13-09-201700:00-
10GANDHINAGARMadhya PradeshMPPGCL423BTL20-09-201714:4823-09-2017
11VSTPSMadhya PradeshNTPC7500due to GT B-PHASE OLTC problem.22-09-201713:27-
12GHATGHARMaharashtraMAHAGENCO2125RBDV LEAKAGE 28-06-201700:01-
13MOUDAMaharashtraNTPC1500Coal Shortage22-09-201710:22-
14TAPSMaharashtraNPCIL3540EMERGENCY MANDATORY REACTOR INSPECTION AS PER REGULATORY REQUIREMENTS;not expected before 15-09-2017, exact date of revival can be confirmed only after regulatory clearance11-07-201716:3030-09-2017
15MOUDAMaharashtraNTPC2500COAL SHORTAGE07-09-201721:47-
16MOUDAMaharashtraNTPC3660COAL SHORTAGE.17-09-201722:14-
17GHATGHARMaharashtraMAHAGENCO1125COMMON PRESSURE SHAFT Problem28-06-201700:01-
18VIPLMaharashtraMAHAGENCO1300GT WORK13-06-201708:30-
 Sub Total(CS) 6743 
  State Sector (SS)
1KORBA(E)ChhattisgarhCSPGCL250BTL08-09-201720:05-
2KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
3KORBA EAST EXT(DSPM)ChhattisgarhCSPGCL1250GENERATOR PROTECTION OPERATED21-09-201714:4523-09-2017
4KORBA(E)ChhattisgarhCSPGCL350MILL FAN OUT22-09-201713:30-
5KORBA(E)ChhattisgarhCSPGCL5120BTL22-09-201718:25-
6GSEGGujaratGSECL178NON-AVILABILITY OF GAS17-09-201708:30-
7GandhinagarGujaratGSECL2120Long restoration period 09-04-201601:30-
8UkaiGujaratGSECL2120Long restoration period 09-04-201616:00-
9STPSGujaratGSECL2120BUNKER PROBLEM24-09-201613:05-
10SLPPGujaratGSECL4125BTL16-09-201713:0021-09-2017
11UkaiGujaratGSECL1120EXCITATION PROBLEM07-05-201603:18-
12GandhinagarGujaratGSECL1120Long restoration period 09-04-201601:30-
13DGBPGujaratGSECL3375HOT WELL CONDUCTIVITY HIGH15-09-201711:17-
14GSEGGujaratGSECL278Non-Availability of Gas17-09-201708:30-
15BECLGujaratGSECL2250DRUM LEVEL HIGH22-08-201716:3420-10-2017
16AmarkantakMadhya PradeshMPPGCL5210Electrical fault25-08-201702:14-
17Satpura IIIMadhya PradeshMPPGCL9210SPARKING ON GT WHILE SYNCHRONIZING FROM AOHDEVELOPED INTO FIRE24-08-201721:05-
18AmarkantakMadhya PradeshMPPGCL3120Fire Caught in Turbine Floor12-01-201500:25-
19AmarkantakMadhya PradeshMPPGCL4120Turbine Vibration High30-04-201411:13-
20JP BinaMadhya PradeshMPPGCL2250Coal feeding problem27-08-201700:38-
21DahanuMaharashtraMAHAGENCO2250Coal Shortage22-09-201700:11-
22RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270COAL SHORTAGE17-09-201700:03-
23KORADI-2(MSEDCL)MaharashtraMAHAGENCO9660coal shortage from 12.09.1707-09-201700:38-
24KoradiMaharashtraMAHAGENCO7210Poor Coal Receipt 12-09-201700:12-
25KhaparkhedaMaharashtraMAHAGENCO3210Poor Coal Receipt 12-09-201700:00-
26ChandrapurMaharashtraMAHAGENCO3210Poor Coal Receipt 12-09-201700:00-
27KhaparkhedaMaharashtraMAHAGENCO5500Turbine vibration high.01-09-201718:2925-09-2017
28RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270COAL SHORTAGE18-09-201700:01-
29WPCLMaharashtraMAHAGENCO3135BTL26-08-201717:40-
30WPCLMaharashtraMAHAGENCO4135IF fan vibration high20-09-201700:00-
31BhusawalMaharashtraMAHAGENCO3210Coal shortage from 29.08.1727-08-201707:43-
32APML TirodaMaharashtraAdani Transmission India Limited4660Due to coal shortage as per informed by MSEB06-09-201721:47-
33UranMaharashtraMAHAGENCO8108Bearing pressure very high14-08-201607:57-
34KoradiMaharashtraMAHAGENCO5200ID fan problem05-09-201600:21-
35BhusawalMaharashtraMAHAGENCO2210BTL14-06-201619:35-
36RATTAN INDIA POWER(N)MaharashtraIndiabulls (N)1270Coal Shortage18-09-201700:01-
37RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270COAL SHORTAGE17-09-201702:01-
38KhaparkhedaMaharashtraMAHAGENCO4210Drum level low13-07-201703:3605-10-2017
39KhaparkhedaMaharashtraMAHAGENCO1210coal shortage08-09-201712:23-
40ChandrapurMaharashtraMAHAGENCO6500Coal shortage from 12.09.1709-09-201704:40-
41PARLIMaharashtraMAHAGENCO8250No Coal since 08-08-201708-08-201700:00-
 Sub Total(SS)8884 
Total Forced Outage (CS+SS): 15627

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
11021.10674317764.10650188841538533149.10

Generating Units Revived during last day which were out before 22-09-17
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1RGPPLMaharashtraRGPPL3A332CHANGE OVER OF UNIT; gas shortage30-08-201720:5522-09-201712:06
2JPL Stg-IIChhattisgarhJindal power2600Furnace Pressure Low21-09-201704:0422-09-201704:46
 Sub Total(CS) 932 
  State Sector (SS)
1EPGLGujaratESSAR2600Coal shortage02-09-201713:0022-09-201701:29
2KLTPSGujaratGujarat475BTL16-09-201713:4022-09-201715:35
3KORBA(E)ChhattisgarhChattisgarh450coal feeder problem20-09-201708:0722-09-201714:43
4GPECGujaratGujarat3218RSD21-09-201720:1422-09-201718:46
5DGBPGujaratGujarat1107RSD21-09-201723:0022-09-201716:38
 Sub Total(SS) 1050 
Total (CS+SS): 1982

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1JPL Stg-IIChhattisgarhJindal power3600Less Schedule17-06-201609:54-
2GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685No Schedule; GMR intimated no PPA on 10-09-201702-08-201601:10-
3DGENGujaratTorrent Power52400NO SCHEDULE/Costly generation25-11-201620:00-
4DGENGujaratTorrent Power51400NO SCHEDULE/Costly generation02-12-201619:28-
5DGENGujaratTorrent Power53400NO SCHEDULE/Costly generation23-12-201619:12-
6JPL Stg-IIChhattisgarhJindal power4600Less schedule at present; out on 24/06/17 on loss of all fuel due to heavy jerk24-06-201716:13-
7JPL Stg-IChhattisgarhJindal power1250RSD/coal shortage since 12-09-201725-06-201700:05-
8GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd1685NO SCHEDULE;GMR intimated no PPA on 10-09-201722-07-201702:00-
9KawasGujaratNTPCGT 2A106withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:37-
10KawasGujaratNTPCST 2C116.10withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:38-
11KawasGujaratNTPCGT 2B106withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:56-
12GandharGujaratNTPCGT ST 3219withdrawn on RSD due to withdrawal of RRAS support by NLDC20-09-201723:59-
 Sub Total(CS) 4567.10 
  State Sector (SS)
1KoradiMaharashtraMaharashtra6210Renovation & Modification Work/converted into RSD 20-03-201501:0201-12-2017
2AECOGujaratTorrent PowerC60RSD01-06-201519:50-
3WPCLMaharashtraMaharashtra1135Low Schedule16-02-201617:03-
4UNOSUGENGujaratTorrent Power1382RSD Load Regulation 04-03-201621:55-
5STPSGujaratGujarat1120RSD26-09-201618:00-
6PIONEER(262+127)MaharashtraMaharashtra1388low schedule 07-02-201717:45-
7GPPCGujaratGujarat2351RSD01-06-201723:58-
8GPECGujaratGujarat2218Low Schedule11-09-201723:50-
9GPECGujaratGujarat1218RSD21-09-201714:10-
10DGBPGujaratGujarat2112RSD21-09-201719:25-
11Hazira ExtGujaratGujarat1351RSD COSTLYGENERATION22-09-201701:30-
 Sub Total(S S) 2545 
Total Low Demand Outage (CS+SS): 7112.10