Select Date
Generation Outage Details
Report for Date 18-07-2018 Date of Reporting 19-07-2018
A. Planned Outages
S.NoStationStateAgencyUnit NoCapacity (MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1RKM PowerChhattisgarhRKMPPL1360NO SCHEDULE/NO PPA12-07-201816:00-
2SIPAT IChhattisgarhNTPC2660AOH16-06-201803:59-
3JPL Stg-IIChhattisgarhJindal power4600RSD05-01-201821:18-
4KawasGujaratNTPCGT 2A106RSD:Change over from GT 2A to GT 1B04-06-201811:25-
5KawasGujaratNTPCST 2C116.10RSD on RLNG24-06-201801:38-
6KawasGujaratNTPCST 1C116.10RSD / NO SCHEDULE17-07-201805:37-
7DGENGujaratTorrent Power52400RSD25-11-201620:00-
8SSP RBPH(Hy)GujaratSSP2200Low reservoir level30-06-201723:45-
9KawasGujaratNTPCGT 1A106RSD/LOW SCHEDULE 13-07-201810:33-
10DGENGujaratTorrent Power53400RSD23-12-201619:12-
11SSP RBPH(Hy)GujaratSSP1200Low reservoir level01-07-201700:00-
12SSP RBPH(Hy)GujaratSSP3200Low reservoir level30-06-201723:45-
13KawasGujaratNTPCGT 2B106RSD18-07-201821:32-
14SSP RBPH(Hy)GujaratSSP6200Low reservoir level01-07-201700:45-
15SSP RBPH(Hy)GujaratSSP5200Low reservoir level; unit-5 is on AOH since 09:00hrs/01.12.201701-07-201700:30-
16SSP RBPH(Hy)GujaratSSP4200Low reservoir level01-07-201700:15-
17VSTPSMadhya PradeshNTPC8500AOH19-06-201800:00-
18SasanMadhya PradeshSASAN_UMPP4660WITHDRAWN ON BTL; CONVERTED TO AOH01-07-201802:11-
19JP NigrieMadhya PradeshJAYPEE2660. CondensorChemical Cleaning & RAPH Major Modification Work The unit is supposed to withdraw at 01:00hrs and rampdown in progress but unit tripped early on Economizer flow low & TDBFP VIBRATION HIGH at 00:07hrs01-07-201800:07-
20RGPPLMaharashtraRGPPL1B320Kept on Dry Preservation/gas shortage31-03-201423:00-
21RGPPLMaharashtraRGPPL1A320Kept on Dry Preservation/gas shortage08-07-201413:30-
22RGPPLMaharashtraRGPPL3B332Kept on Dry Preservation/gas shortage09-07-201814:09-
23RGPPLMaharashtraRGPPL3A332unit change over;less gas availability28-06-201814:21-
 Sub Total(CS)  7294.20 
  State Sector (SS)
1DGBPGujaratGSECL3375RSD22-06-201813:01-
2UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
3WanakboriGujaratGSECL1210RSD12-07-201807:33-
4GIPCL STGGujaratGSECL2165No purchase from 1st March 1801-03-201800:00-
5GSEGGujaratGSECL278RSD22-06-201800:37-
6GandhinagarGujaratGSECL3210RSD24-06-201809:07-
7WanakboriGujaratGSECL2210RSD14-07-201823:37-
8WanakboriGujaratGSECL5210RSD15-07-201800:21-
9DGBPGujaratGSECL2112RSD17-07-201816:26-
10DGBPGujaratGSECL1107RSD18-07-201802:30-
11GSEG STAGE IIGujaratGSECL1351RSD22-06-201816:11-
12SLPPGujaratGSECL1125AOH08-07-201818:48-
13SLPPGujaratGSECL2125AOH08-07-201815:08-
14OPGSGujaratGSECL1150MAINTENANCE01-07-201800:08-
15GPPCGujaratGSECL2351RSD26-06-201817:00-
16STPSGujaratGSECL3250RSD25-06-201813:23-
17GPPCGujaratGSECL1351RSD23-06-201806:18-
18UTRAN STG IIGujaratGSECL1375RSD22-06-201823:42-
19GSEGGujaratGSECL178RSD22-06-201801:29-
20WanakboriGujaratGSECL3210RSD16-07-201808:02-
21WanakboriGujaratGSECL7210AOH10-07-201802:15-
22UkaiGujaratGSECL3200AOH15-07-201800:19-
23UkaiGujaratGSECL5210RSD16-07-201810:25-
24AmarkantakMadhya PradeshMPPGCL5210AOH01-07-201800:55-
25Sanjay Gandhi TPSMadhya PradeshMPPGCL4210AOH30-06-201823:54-
26Satpura IVMadhya PradeshMPPGCL10250AOH.05-07-201800:05-
27PARLIMaharashtraMAHAGENCO6250RSD24-06-201818:00-
28RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270No schedule12-07-201801:28-
29KhaparkhedaMaharashtraMAHAGENCO5500unit taken out for renovation work20-06-201805:41-
30PARLIMaharashtraMAHAGENCO7250ZERO SCHEDULE24-06-201800:00-
31KOYNA ST-IVMaharashtraMAHAGENCO4250AOH12-06-201809:40-
32PARLIMaharashtraMAHAGENCO5210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201606-07-201514:55-
33NasikMaharashtraMAHAGENCO5210rsd12-07-201800:00-
34RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270rsd12-07-201800:00-
35PARLIMaharashtraMAHAGENCO4210ECONOMIC SHUT DOWN SINCE 1ST APRIL 201605-07-201518:45-
36WPCLMaharashtraMAHAGENCO1135RSD/No PPA16-02-201617:03-
37TrombayMaharashtraMAHAGENCO6500Unit 6 is kept under economic shutdown since 4th May. 04-05-201600:00-
38PIONEER(262+127)MaharashtraMAHAGENCO1388RSD07-02-201717:45-
39RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270No schedule26-06-201800:00-
40JaigadMaharashtraMAHAGENCO3300AOH09-07-201800:42-
41WPCLMaharashtraMAHAGENCO2135RSD/No PPA29-02-201621:46-
 Sub Total(SS) 9863 
Total Planned Outage (CS+SS): 17157.20

B. Forced Outages
S.NoStationStateAgencyUnit NoCapacity(MW)Reason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1GMR CHHATISGARHChhattisgarhGMR Chattisgarh Energy Ltd2685Turbine casing drain heavy leakage17-04-201823:39-
2KWPCLChhattisgarhKWPCL1600Stator earth fault protection operated/maintenance22-05-201722:12-
3JPL Stg-IChhattisgarhJindal power2250COAL SHORTAGE11-02-201800:00-
4SKS PowerChhattisgarhSKS2300furnace pressure low07-06-201808:00-
5JPL Stg-IIChhattisgarhJindal power3600Coal Shortage18-06-201800:00-
6KSKChhattisgarhKSK Mahanadi Power Co Ltd3600ASH EVACUATION SYSTEM PROBLEM;COAL SHORTAGE since 06-07-201805-06-201823:57-
7VandanaChhattisgarhVandana1135BTL09-01-201515:00-
8JPL Stg-IChhattisgarhJindal power4250COAL SHORTAGE14-07-201800:00-
9DGENGujaratTorrent Power51400not able to run in combined cycle21-05-201821:30-
10CGPLGujaratCGPL_UMPP50830Withdrawn for feed water pre-heater repair15-03-201801:39-
11KAPSGujaratNPCIL2220NUCLEAR REACTOR SIDE PROB01-07-201514:0901-12-2018
12KAPSGujaratNPCIL1220REACTOR SIDE PROBLEM11-03-201608:5201-10-2018
13Jhabua PowerMadhya PradeshJhabua Power1600No schedule15-07-201805:28-
14GMR WARORAMaharashtraGMR WARORA1300coal shortage07-07-201819:57-
 Sub Total(CS) 5990 
  State Sector (SS)
1KORBA(E)ChhattisgarhCSPGCL250Mill fan problem23-10-201720:53-
2KORBA(E)ChhattisgarhCSPGCL150WATER WALL TUBE LEAKAGE06-08-201721:46-
3EPGLGujaratESSAR1600Coal shortage23-01-201818:51-
4APL MundraGujaratAdani Transmission India Limited6660Turbine bearing temperature high & thereafter withheld from 15.11.2017 due to coal shortage.20-10-201720:20-
5BECLGujaratGSECL1250Lignite shortage02-07-201811:07-
6APL MundraGujaratAdani Transmission India Limited5660APH Á & thereafter withheld from 15.11.2017 due to coal shortage.01-11-201723:43-
7BECLGujaratGSECL2250OEM BHEL pending work; UNIT IS OUT DUE TO LIGNITE SHORTAGE AND ALSO WATER SHORTAGE AS INTIMATED BY GUJARAT ON 29-05-201822-04-201800:00-
8EPGLGujaratESSAR2600coal shortage 24-10-201720:25-
9STPSGujaratGSECL4250Turbine problem18-07-201819:10-
10Sanjay Gandhi TPSMadhya PradeshMPPGCL3210ECONOMIZER TUBE LEAKAGE18-07-201802:52-
11JP BinaMadhya PradeshMPPGCL1250COAL SHORTAGE11-07-201823:54-
12KoradiMaharashtraMAHAGENCO7210COAL SHORTAGE11-06-201822:18-
13GHATGHARMaharashtraMAHAGENCO1125Stator earth fault14-04-201823:45-
14KORADI-2(MSEDCL)MaharashtraMAHAGENCO8660Flame failure;Coal shortage w.e.f 30-06-201829-06-201813:27-
15ChandrapurMaharashtraMAHAGENCO3210water shortage03-12-201701:35-
16ChandrapurMaharashtraMAHAGENCO4210water shortage03-12-201714:17-
17VIPLMaharashtraMAHAGENCO1300Coal shortage11-06-201800:30-
18ChandrapurMaharashtraMAHAGENCO9500Reheater protection operated01-07-201811:35-
19GHATGHARMaharashtraMAHAGENCO2125STATOR EARTH FAULT29-06-201801:12-
20UranMaharashtraMAHAGENCO6108GT Buchholz relay relay operated 09-06-201811:50-
21IEPLMaharashtraIEPL1270Coal Shortage11-07-201813:00-
22KoradiMaharashtraMAHAGENCO6210due to low pressure16-07-201809:18-
23ParasMaharashtraMAHAGENCO3250BTL16-07-201812:39-
24RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd1270Coal shortage01-05-201800:00-
25RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd4270Bottom Ash Problem.22-06-201817:21-
26NasikMaharashtraMAHAGENCO4210BTL; available since 16:00hrs/03-06-2018, but kept out to save coal / coal shortage01-06-201800:53-
27Dhariwal STUMaharashtraDhariwal Infrastructure Ltd1300Coal shortage13-07-201823:59-
28BhusawalMaharashtraMAHAGENCO3210COAL SHORTAGE07-06-201800:02-
 Sub Total(SS)8268 
Total Forced Outage (CS+SS): 14258

Regional Generation Outage Summary (MW)
Central SectorState SectorRegional Total Outage(MW)
PlannedForcedTotal(CS)PlannedForcedTotal(SS)
7294.20599013284.20986382681813131415.20

Generating Units Revived during last day which were out before 18-07-18
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageRevival
DateTimeDateTime
  Central Sector (CS)
1KawasGujaratNTPCGT 2B106RSD on RLNG24-06-201801:4518-07-201821:13
2KawasGujaratNTPCGT 1B106RSD/NO SCHEDULE17-07-201805:5318-07-201821:21
3JPL Stg-IIChhattisgarhJindal power2600APH GEAR BOX PROBLEM17-07-201822:0018-07-201821:30
 Sub Total(CS) 812 
  State Sector (SS)
1DGBPGujaratGujarat1107Bearing vibration high23-06-201807:4518-07-201800:36
2GPECGujaratGujarat1218RSD14-07-201800:1318-07-201819:31
3GPECGujaratGujarat3218RSD14-07-201823:0618-07-201820:05
4KLTPSGujaratGujarat170BTL15-07-201807:0118-07-201810:52
5WanakboriGujaratGujarat6210RSD15-07-201807:1918-07-201810:52
6GandhinagarGujaratGujarat4210RSD15-07-201819:0418-07-201823:48
7GPECGujaratGujarat2218RSD17-07-201822:0918-07-201807:04
 Sub Total(SS) 1251 
Total (CS+SS): 2063

Outages due to Low Demand
S.NoStationLocationOwnerUnit NoCapacityReason(s)OutageExpected Revival Date
DateTime
  Central Sector (CS)
1DGENGujaratTorrent Power52400RSD25-11-201620:00-
2DGENGujaratTorrent Power53400RSD23-12-201619:12-
3JPL Stg-IIChhattisgarhJindal power4600RSD05-01-201821:18-
4KawasGujaratNTPCGT 2A106RSD:Change over from GT 2A to GT 1B04-06-201811:25-
5KawasGujaratNTPCST 2C116.10RSD on RLNG24-06-201801:38-
6RKM PowerChhattisgarhRKMPPL1360NO SCHEDULE/NO PPA12-07-201816:00-
7KawasGujaratNTPCGT 1A106RSD/LOW SCHEDULE 13-07-201810:33-
8Jhabua PowerMadhya PradeshJhabua Power1600No schedule15-07-201805:28-
9KawasGujaratNTPCST 1C116.10RSD / NO SCHEDULE17-07-201805:37-
10KawasGujaratNTPCGT 2B106RSD18-07-201821:32-
 Sub Total(CS) 2910.20 
  State Sector (SS)
1WPCLMaharashtraMaharashtra1135RSD/No PPA16-02-201617:03-
2WPCLMaharashtraMaharashtra2135RSD/No PPA29-02-201621:46-
3UNOSUGENGujaratTorrent Power1382RSD04-03-201621:55-
4PIONEER(262+127)MaharashtraMaharashtra1388RSD07-02-201717:45-
5GSEGGujaratGujarat278RSD22-06-201800:37-
6GSEGGujaratGujarat178RSD22-06-201801:29-
7DGBPGujaratGujarat3375RSD22-06-201813:01-
8GSEG STAGE IIGujaratGujarat1351RSD22-06-201816:11-
9UTRAN STG IIGujaratGujarat1375RSD22-06-201823:42-
10GPPCGujaratGujarat1351RSD23-06-201806:18-
11GandhinagarGujaratGujarat3210RSD24-06-201809:07-
12PARLIMaharashtraMaharashtra6250RSD24-06-201818:00-
13STPSGujaratGujarat3250RSD25-06-201813:23-
14RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd3270No schedule26-06-201800:00-
15GPPCGujaratGujarat2351RSD26-06-201817:00-
16NasikMaharashtraMaharashtra5210rsd12-07-201800:00-
17RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd2270rsd12-07-201800:00-
18RATTAN INDIA POWER(A)MaharashtraRattan India Power Ltd5270No schedule12-07-201801:28-
19WanakboriGujaratGujarat1210RSD12-07-201807:33-
20WanakboriGujaratGujarat2210RSD14-07-201823:37-
21WanakboriGujaratGujarat5210RSD15-07-201800:21-
22WanakboriGujaratGujarat3210RSD16-07-201808:02-
23UkaiGujaratGujarat5210RSD16-07-201810:25-
24DGBPGujaratGujarat2112RSD17-07-201816:26-
25DGBPGujaratGujarat1107RSD18-07-201802:30-
 Sub Total(S S) 5998 
Total Low Demand Outage (CS+SS): 8908.20